Vietnam.vn - Nền tảng quảng bá Việt Nam

Ha Tinh province allocates 40 billion VND to repair landslides affecting embankments and coastal roads.

On January 21st, Mr. Nguyen Xuan Bac, Vice Chairman of the People's Committee of Mai Phu commune (Ha Tinh province), announced that the Provincial People's Committee has allocated 40 billion VND to upgrade and completely resolve the subsidence and erosion of the wave-breaking embankment and road along the Ta Nghen dike, the section passing through Mai Lam village.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng22/01/2026

Currently, relevant authorities are coordinating to inspect, measure boundary markers, and design the project in order to begin construction in 2026, ensuring the safety of the structure and protecting the lives and property of residents before the upcoming rainy and stormy season.

Previously, on December 5, 2025, the SGGP newspaper published an article titled "Coastal breakwater severely eroded," reflecting on the breakwater along the Ta Nghen dike, constructed around 2022-2023. This is a critical structure directly protecting the lives and property of approximately 500-600 households in the villages of Mai Lam, Dong Thang, Dong Vinh, and Hop Tien. However, due to the successive impacts of typhoons No. 5 and No. 10, over 150 meters of the breakwater have been severely eroded and damaged, and the damage is continuing to spread dangerously.

Source: https://www.sggp.org.vn/ha-tinh-phan-bo-40-ty-dong-khac-phuc-sat-lo-ke-va-duong-ven-bien-post834647.html


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Same author

Di sản

Figure

Enterprise

News

Political System

Destination

Product

Happy Vietnam
always wear a bright smile

always wear a bright smile

80th National Day

80th National Day

The Cua Viet Bridge connects two shores of happiness.

The Cua Viet Bridge connects two shores of happiness.