
The landslide occurred at Km224+700, on the road from Duc Trong to Da Lat. Based on on-site observations, the landslide extended for approximately 20 meters, with soil and rocks collapsing, causing the guardrail system to slide down about 1.5 meters below the road surface.

Immediately after the incident occurred, officials from the Lam Dong Provincial Road Maintenance Board arrived to inspect and record the landslide situation, and also proceeded to put up warning tape to ensure the safety of vehicles traveling through the area.
Vice Chairman of the Lam Dong Provincial People's Committee Nguyen Hong Hai personally inspected the landslide site.


Reporters captured some images at the scene:





Source: https://baolamdong.vn/xuat-hien-diem-sat-lo-de-doa-an-toan-deo-mimosa-403561.html






Comment (0)