

The social housing project on the left bank of the Red River in Van Hoa commune consists of 4 buildings, each 12 stories high, with 760 apartments; a total floor area of approximately 66,560 m² , a land area of 1.66 hectares; a construction area of 8,593 m² ; a construction density of 51.74%; and a building height of 45.95 m. Each apartment ranges from 45 to 76 m² . The estimated population is approximately 1,870 people (25 m² floor area per person).
Other areas that will receive investment include: The project includes transportation systems, internal routes, parking garages, green spaces, courtyards, etc. The total investment for the project is 563 billion VND .
To date, the two buildings A1 and B1 are under construction, with the rough structure reaching the 10th floor. Completion and handover are expected in Q3/2025.
Buildings A2 and B2 are currently under construction, with columns and walls on the first floor being installed. They are expected to be completed and handed over in Q4/2025.
The sale of houses under construction in the project has been approved by the Department of Construction, with an estimated (provisional) appraised price of VND 15,976,757/ m² of usable area (calculated according to a coefficient depending on the specific location).
Source: https://baolaocai.vn/hoan-thien-tham-dinh-158-bo-ho-so-post400528.html






Comment (0)