English
Login
Homepage
Topic
News
Political System
Destination
Event
Travel
Happy Vietnam
Enterprise
Product
Heritage
Museum
Figure
Multimedia
Data
national power system
Thousands of megawatts of gas and oil-fired power plants are ready to share the load with the national power grid.
Báo Thanh niên
8 giờ trước
Electricity supply shortages may necessitate the implementation of evening peak hours starting in June.
Báo Thanh niên
24/05/2026
Electricity supply tensions expected next week; proposal to implement peak and off-peak electricity pricing soon.
Báo Tuổi Trẻ
22/05/2026
Electricity supply in the face of increased load pressure.
Báo Tuyên Quang
21/05/2026
Due to the heatwave, nationwide electricity consumption reached a new record, soaring above 1.1 billion kWh.
Báo Thanh niên
15/05/2026
The national power grid set a new record during the peak of the 2026 dry season.
Hà Nội Mới
14/05/2026
The national power grid sets a new record during the peak of the heatwave.
Hà Nội Mới
14/05/2026
New regulations on peak and off-peak hours for the national power grid.
Báo Đà Nẵng
27/04/2026
Violations of power system regulations can result in fines of up to 200 million VND.
Báo Đà Nẵng
22/04/2026
Proposal to change the electricity pricing schedule.
Báo Thanh niên
08/04/2026
Vinh Tan 2 Thermal Power Plant is ready to produce electricity during the dry season.
Báo Lâm Đồng
03/04/2026
Strategic vision to transform Quang Trach into the national energy 'backbone'.
VTC News
01/04/2026
Lam Dong province strives to maintain electricity supply during the peak of the dry season.
Báo Lâm Đồng
24/03/2026
Focus resources on repairs before the peak of the hot season.
Báo Tin Tức
19/03/2026
Focus resources on repairing the power system before the peak of the hot season.
Báo Tin Tức
19/03/2026
Lam Dong province takes a proactive approach in managing electricity supply.
Báo Lâm Đồng
08/02/2026
Proactive in managing electricity supply.
Báo Lâm Đồng
08/02/2026
Proposals for installing rooftop solar power systems only require notification to the People's Committee at the commune level.
Báo Tuổi Trẻ
09/01/2026
Gia Lai: Commercial operation completed for the Ia Pech and Ia Pech 2 wind power clusters, with a capacity of 99 MW.
Báo Gia Lai
06/01/2026
Energizing the shunt reactors at 4 500kV substations.
Báo Tin Tức
31/12/2025
Safe operation, efficient investment, and maintaining the 'backbone' of the national power system.
Báo Chính Phủ
30/12/2025
Nhon Trach 3 and 4 Power Plants: Paving the way for clean LNG power.
Báo Tin Tức
14/12/2025
Nhon Trach 3 and 4 Power Plants: Pioneering the way for clean LNG power.
Báo Tin Tức
14/12/2025
Approval of the operating method for the national power grid in 2026.
Báo Đà Nẵng
01/12/2025