Vietnam.vn - Nền tảng quảng bá Việt Nam

Approval granted for investment in 3 bridges on Provincial Road 827E totaling over 4.797 billion VND.

On April 29th, information from the Long An Provincial People's Committee indicated that the investment plan for the project to build three bridges on Provincial Road (DT) 827E – a bridge over the Can Giuoc River, a bridge over the Vam Co Dong River, and a bridge over the Vam Co Tay River – has been approved by the Provincial People's Council.

Báo Long AnBáo Long An29/04/2025

Perspective view of the bridge over the Vam Co Tay River.

The project is managed by the Long An Provincial Investment and Construction Project Management Board, with a total investment of over 4,797.7 billion VND, including over 4,000 billion VND in ODA loans from South Korea. The expected implementation period is 2025 - 2030.

These three bridges play a strategic role in completing the province's transportation infrastructure, forming a continuous connection route from Ho Chi Minh City through Long An to Tien Giang . Through this, the project will significantly contribute to strengthening connectivity between the Mekong Delta and Ho Chi Minh City and international gateways, reducing pressure on National Highways 1, N2, and 50; while ensuring safe and efficient transportation of goods and passengers, contributing to reducing traffic congestion, accidents, and environmental pollution.

Specifically, the Can Giuoc Bridge is approximately 568m long, with a 90m main span in the form of a steel arch, and a bridge width of 6 lanes. The approach roads to the bridge are approximately 1.482km long, with a design speed of 80km/h.

The Vam Co Dong Bridge is approximately 1,356m long, uses a cable-stayed main span structure (90m + 150m), has a design load of HL93, and is 6 lanes wide.

The Vam Co Tay Bridge is approximately 1,412m long, using an Extradosed main span structure (80m + 130m + 80m), with a design load of HL93 and a width of 6 lanes.

The Long An Provincial People's Committee further stated that the land clearance project for the bridges and access roads has been approved according to Decision No. 13092/QD-UBND, dated December 16, 2024.

Upon completion, the project will contribute to promoting the development of key economic sectors of the province such as agriculture, fisheries, industry, services, and tourism; while also improving transportation capacity, attracting investment, serving national defense and security requirements, and gradually improving the quality of life for people in the area.

Le Duc

Source: https://baolongan.vn/phe-duyet-chu-truong-dau-tu-3-cau-tren-tuyen-duong-tinh-827e-hon-4-797-ti-dong-a194417.html


Comment (0)

Please leave a comment to share your feelings!

Same category

Shimmering in the lights, the churches of Da Nang become romantic rendezvous spots.
The extraordinary resilience of these steely roses.
Crowds flocked to the Cathedral to celebrate Christmas early.
Admire the dazzling churches, a 'super hot' check-in spot this Christmas season.

Same author

Heritage

Figure

Enterprise

The Christmas atmosphere is vibrant on the streets of Hanoi.

News

Political System

Destination

Product