English
Login
Homepage
Topic
News
Political System
Destination
Event
Travel
Happy Vietnam
Enterprise
Product
Heritage
Museum
Figure
Multimedia
Data
stillness bridge
The 'miracle team' successfully lifted the 9,000-ton Binh Phuoc 1 bridge by an additional 1.25 meters.
Báo Tuổi Trẻ
14/12/2025
Binh Phuoc 1 Bridge: A temporary steel bridge is being erected so that the "miracle worker" can raise the bridge to 1.25m.
Báo Tuổi Trẻ
02/10/2025
The "miracle workers" team has successfully lifted the Binh Trieu 1 bridge to a height of 1.08m and is now continuing to lift the Binh Phuoc 1 bridge.
Báo Tuổi Trẻ
30/09/2025
What is the current status of the project to raise the clearance of 11 bridges in the Mekong Delta?
Báo Xây dựng
23/01/2025