Vietnam.vn - Nền tảng quảng bá Việt Nam

Electricity saving reached more than 43% of the yearly plan

(HGO) - Hau Giang Electricity Company said that the province is supplied with electricity from the national power system through the 220kV Can Tho 2 transformer station, the 220kV Chau Thanh 2 transformer station, the 220kV Rach Gia 2 transformer station, and the 220kV Ca Mau 2 transformer station. The 110kV power grid in the province has 6 transformer stations with a total capacity of 440MVA. The average load level of the 110kV power grid is 61%.

Báo Hậu GiangBáo Hậu Giang27/06/2025

The electricity industry ensures safe and continuous electricity supply to customers.

As of May 31 , 2025 , Pmax reached 188.78 MW. Since the beginning of the year, the company has ensured stable and safe electricity supply for socio-economic development, meeting people's daily needs as well as ensuring electricity supply for cultural - political - social events in the province.

Regarding electricity saving , in the first 5 months of the year, the province saved 10.62 million kWh of electricity, reaching 2.42% of the actual commercial electricity output, reaching 43.51% compared to the plan for the whole year 2025 (plan assigned 24.4 million kWh). Specifically, administrative agencies and public lighting saved 1.97 million kWh; service business was 0.40 million kWh; household lighting was 4.16 million kWh and industrial production saved 4.09 million kWh.

DREAM TOTAL

Source: https://baohaugiang.com.vn/cong-thuong/tiet-kiem-dien-dat-hon-43-ke-hoach-ca-nam-142552.html


Comment (0)

No data
No data

Same category

Lotus tea - A fragrant gift from Hanoi people
More than 18,000 pagodas nationwide rang bells and drums to pray for national peace and prosperity this morning.
The Han River sky is 'absolutely cinematic'
Miss Vietnam 2024 named Ha Truc Linh, a girl from Phu Yen

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product