In 2022, through the inspection of 17 projects in 3 units of Nam Po district (Department of Education and Training 1 project; Department of Economy - Infrastructure 5 projects and Project Management Board of district works 11 projects) With a total investment of 113,206 billion VND, the delegation of the Provincial Inspectorate discovered many violations. The work of making construction estimates in some work items is still inaccurate, calculating the wrong volume, applying the wrong unit price: over calculating the volume of installing moldless doors (Nam Tin Commune Headquarters, Vang). Dan); wrong calculation of the volume of cement concrete covering, culvert items of the repair and upgrading works of Na Hy 2 village, Na Hy commune. At the headquarters of the Communal Military Command - Commune Police of 3 communes Na Bong, Na Co Sa and Si Pa Phin, the construction lacked the volume of yard screeding, B40 wire mesh fence, etc. some items still calculate wrong volume, wrong norm, unit price; The verification, appraisal, acceptance, payment request has not discovered all shortcomings and errors, leading to the wrong payment request of nearly 552 million VND.
At the beginning of 2023, the Provincial Inspectorate inspected 40 projects in the city. Dien Bien Phu with a total investment of more than 152 billion VND, invested by the City Project Management Board. The inspected projects are mainly repair and improvement works of infrastructure items, such as: roads, drainage ditches, working offices, people's markets... Through the inspection, many were discovered. limitations and mistakes such as: The formulation and proposal of investment policies for some projects are not close to reality, increasing investment costs. For example, in the project of upgrading roads and drainage ditches in Ta Leng village, from the beginning of the village to the football field of Thanh Minh commune, the assessment of the current state of concrete roads to establish investment policies is not close to reality. Similarly, in the Project of Repairing and Renovating Roads and Drains of Residential Groups 9, 13 and 14 in Muong Thanh Ward, the determination of the current status of a number of branch lines to establish investment policies is not close to reality; when checking the status of a number of branch lines that are still in good use, the competent authority has cut back the investment with an amount of nearly 1,5 billion dong… Besides, the survey estimation work in some projects The project is still inaccurate, wrong volume: Estimating the overcalculation of measuring the ground control grid, level II pass at 4 works (repairing roads for residential groups 1, 3, and 9 in Him Lam ward; fixing repairing and renovating roads and drainage ditches of residential groups 9, 13 and 14 in Muong Thanh ward; concrete road in Long Hom village, Thanh Minh commune; concrete road in Huoi Pha village) with an amount of more than 30,2 million dong; Estimating incorrectly calculated volume of topographic survey of works at 2 works (embankment against landslides on both sides of Nam Rom stream, section flowing through Huoi He village, Na Nhan commune; concrete road, drainage ditch for groups 2 and 8. , 9 Nam Thanh wards) with an amount of nearly 15 million VND; determination of investment estimates for upgrading and construction of C13 market in phase II is inaccurate, leading to incorrect calculation of consulting costs in the amount of more than 20 million VND… The inspection team proposed to recover nearly 366 million VND. money for wrongdoing; adjusted and reduced the value of construction and installation bidding packages by more than 186 million dong and deducted from the acceptance and payment of works more than 225 million dong. At the same time, it is recommended that the City Project Management Board. Dien Bien Phu strengthens the inspection and supervision of the management of investment projects in the area. Select survey, design, project planning, verification and supervision consultants with sufficient capacity, experience and responsibility in order to improve the quality of documents and limit errors. Develop a plan and propose the City People's Committee to balance and allocate enough capital for projects to make final payment, speeding up the construction progress of completed works and put into use to ensure investment efficiency.
In addition to the above projects, the inspection agency regularly inspects and inspects the implementation of investment projects in the province. Since the beginning of 2023, the whole industry has implemented 47 administrative inspections and 335 specialized inspections. At the same time, the Provincial People's Council held many thematic and regular supervisions in the field of public investment. Through inspection and supervision, violations have been detected, thereby promptly correcting the management, perfecting mechanisms, policies and laws; detected more than 3,5 billion VND in economic violations, proposed to recover more than 2 billion VND, other economic proposals were nearly 1,5 billion VND. At the same time, request the investor unit to overcome the shortcomings and mistakes in the management of construction investment; management and use of project management costs.