Vice Chairman of the Provincial People's Committee Le Ngoc Chau asked localities and units to proactively develop plans and plans to respond to natural disasters and protect key positions of La Giang dike route.
On the afternoon of August 15, Vice Chairman of the Provincial People's Committee, Deputy Head of the Commanding Committee for Disaster Prevention and Search and Rescue (Communication Committee for Disaster Prevention and Control) of the province Le Ngoc Chau and the delegation inspected the disaster prevention work on the La Giang dike and Hong town. Linh. Accompanying were leaders of the Department of Agriculture and Rural Development, members of the Executive Committee for Disaster Prevention and Control, Duc Tho District and Hong Linh Town, and Bac Ha Tinh Irrigation Company Limited. |
Vice Chairman of the Provincial People's Committee Le Ngoc Chau and the delegation to inspect the operation of Trung Luong sluice on La Giang dike line.
Vice Chairman of the Provincial People's Committee Le Ngoc Chau and the delegation visited to inspect the operation of Trung Luong sluice (Trung Luong ward, Hong Linh town), Duc Xa sluice (Bui La Nhan commune, Duc Tho district) and important positions. weak on La Giang dike route.
La Giang dike route is located on the right bank of La river with a length of 19,2 km, of which the part passing through Duc Tho district is 15,7 km long and the part passing through Hong Linh town is 3,5 km long. The dike route protects nearly 300.000 people and more than 48.000 hectares of land in districts: Duc Tho, Can Loc, Hong Linh town and a part of Thach Ha and Loc Ha districts.
La Giang dike route plays an important role in storm prevention in Ha Tinh.
The entire La Giang dike route has 8 sluices under the dike, including 4 sluices for irrigation combined with drainage and 4 sluices at pumping stations across the dike. Bac Ha Tinh Irrigation Company Limited manages and operates 7 sluices, the remaining culverts are implemented by the People's Committee of Duc Tho district.
La Giang dike project is the key flood control of the province. On the basis of the current status of the dike route and the reality of flood and storm control over the years, units and localities have identified a number of key and dangerous key areas where incidents may occur in the event of a major flood. , from which to develop a specific response plan.
Vice Chairman of the Provincial People's Committee Le Ngoc Chau and the delegation inspecting Duc Xa sluice on La Giang dike line.
Regarding the decentralization of command to handle situations, the Provincial Steering Committee for Disaster Prevention and Control and Prevention is responsible for directing the dike protection work when floods occur exceeding the design frequency or dangerous incidents occur beyond the ability of the province to handle. The Committee for Disaster Prevention and Control and Technical Construction of La Giang dyke, the Committee for Disaster Prevention and Control and Technical Development of Duc Tho district, Hong Linh town.
Duc Xa Congregation on La Giang dike route.
The Executive Committee for Disaster Prevention and Control and Prevention of La Giang dike is responsible for directing the Executive Committee for Damage Prevention and Control of Duc Tho, Hong Linh Town, Bac Ha Tinh Irrigation One Member Limited Liability Company according to their functions and duties, to organize the mobilization of forces, materials, vehicles and all real resources. show dike protection plan; evacuate the population along the La Giang dyke to a safe place when natural disasters and force majeure events occur...
Vice Chairman of the Provincial People's Committee Le Ngoc Chau and the delegation inspect the anti-corruption work in Hong Linh town.
Next, the delegation led by Vice Chairman of the Provincial People's Committee Le Ngoc Chau came to inspect the anti-corruption work in Hong Linh town. The delegation directly inspected Thien Tuong lake, Da Bac lake, Nham Xa dam and anti-corruption work in Thuan Loc commune.
In order to proactively respond to natural disasters, Hong Linh Town held a conference to review, review and draw lessons from disaster prevention and control in 2022 and deploy tasks in 2023.
Inspection team for damage and deterioration at Nham Xa dam, Dau Lieu ward, Hong Linh town.
TX also actively develops plans to prevent and respond to strong storms and super typhoons; the plan to protect the key positions and protect the La Giang dyke across the area; residential evacuation plan when natural disasters occur in the township; Approving plans to ensure safety for dams…
After the inspection, Vice Chairman of the Provincial People's Committee Le Ngoc Chau had a working session with relevant units on the prevention of disaster on La Giang dike and Hong Linh town.
Vice Chairman of the Provincial People's Committee Le Ngoc Chau chaired the meeting on anti-corruption work on La Giang dike and Hong Linh town.
At the meeting, the local representative of the unit clarified the current status of the work and the plan for dyke protection and key protection of the La Giang dike route passing through the area; Hong Linh Town reports on the preparation of disaster prevention and control in 2023.
Hong Linh town proposed the province to allocate funds to repair and upgrade Nham Xa dam; building a canal after biological pit No. 3 (Dau Lieu ward) to serve water drainage in the ward and Nam Hong; financial support to purchase equipment for the commune-level assault force…
Vice Chairman of the Provincial People's Committee spoke at the meeting.
Speaking at the meeting, Vice Chairman of the Provincial People's Committee Le Ngoc Chau acknowledged the initiative of localities and units in developing plans and plans to be ready to respond to natural disaster situations, to protect local residents. the key location of La Giang dike route and in Hong Linh town.
The situation of natural disasters and storms in 2023 is forecasted to be complicated, Vice Chairman of the Provincial People's Committee Le Ngoc Chau asked localities and units to focus on disaster prevention and continue to promote propaganda. , raising awareness about disaster prevention to every household and people.
Local authorities need to review key locations prone to flash floods, pipe floods and landslides to promptly warn people; make a list of households located in disaster-prone areas and relocate when necessary; prepare forces, means, materials and funds to actively respond to floods; forces according to their assigned tasks, regularly check to identify key and critical positions and always have a plan to protect the safety of La Giang dike route...
Van Duc