Previously, Da Nang Bridge and Road Joint Stock Company had 4 documents to report to the Da Nang Department of Transport on the damage to the road surface within the scope of underground cable construction by Da Nang Electricity One Member Limited Liability Company.
The Department of Transport of Da Nang City checked and determined that in the past time, this department has granted construction permits to Da Nang Electricity One Member Limited Liability Company to carry out the construction and installation of underground cables on the roads under operation.
However, at present, the scope of returning the road surface and pavement of some roads in the coastal area of Da Nang often appears damaged.
Meanwhile, this place is an area with a lot of traffic to serve tourists such as Ho Nghinh, Loseby, Vo Nguyen Giap, and Hoang Sa routes.
Given that the return of the road surface and sidewalks is not of good quality, there are many damages in the drilling positions, causing traffic insecurity, loss of urban beauty, etc., the Department of Transport announced the temporary suspension of granting permits. construction permits for works constructed by Da Nang Electricity One Member Company Limited on roads under the management of this department.
The Department of Transport requested Da Nang Electricity to review and report the causes of damage, remedial solutions, measures to handle contractors and commitments not to recur before considering re-issuance of construction permits.
After receiving the request of the Department of Transport, Da Nang Electricity directed the construction contractors to fix the damaged locations when constructing underground cables, re-construct the previous positions to return the road surface and sidewalk. to ensure quality, aesthetics.