Vietnam.vn - Nền tảng quảng bá Việt Nam

TKV strives to achieve a production output of over 10.5 million tons of clean coal in the second quarter of 2025.

On April 28, the Vietnam Coal and Mineral Industry Group (TKV) announced that in the second quarter, the entire group is expected to produce 10.15 million tons of raw coal; remove 40.51 million cubic meters of overburden in preparation for production; excavate 72,435 meters of new tunnels; and strive to produce 10.56 million tons of clean coal, including nearly 9.5 million tons of clean coal from raw coal and nearly 1.1 million tons of clean coal recovered from non-coal products.

Báo Nhân dânBáo Nhân dân28/04/2025

At the end of the first quarter, the entire TKV Group produced over 10.5 million tons of raw coal, equivalent to 27.7% of the annual plan and 107.5% of the Q1/2025 operational plan; excavated over 44,300m of tunnels; produced over 10 million tons of clean coal from raw materials; consumed nearly 12.6 million tons of coal; and the mechanical engineering sector's revenue was estimated at 865.8 billion VND.

At the conference summarizing the work of coal production and business management; technical and technological work and mine electromechanical-transportation in the first quarter of 2025, Deputy General Director of TKV, Director of the Production Management Center in Quang Ninh Nguyen Huy Nam and Deputy General Director of TKV Nguyen Van Tuan assessed that the TKV leadership, the Coal Production Department and specialized departments have proactively grasped the production situation, closely monitored the units to resolve difficulties and obstacles arising in the production process.

TKV strives to achieve a production output of over 10.5 million tons of clean coal in the second quarter of 2025 (image 1).

Underground coal mining at Ha Lam Coal Company.

Basically, all units successfully completed the main targets as planned; the blending and processing of imported coal was managed flexibly and decisively; and the Group's mining technology and transportation electromechanical engineering also achieved many positive results.

In the second quarter, TKV's leadership requested the Group's specialized departments and coal production units to maintain stable production according to contracts; and proactively develop plans in accordance with mining licenses.

Deputy General Director of TKV, Nguyen Van Tuan, instructed specialized departments and units to continue managing and stabilizing the production of products according to signed contracts; proactively develop plans for managing the production of raw coal, clean coal, and the consumption of mined coal in accordance with the granted mining licenses.

TKV strives to achieve a production output of over 10.5 million tons of clean coal in the second quarter of 2025 (image 2).

Deputy General Director of TKV, Nguyen Van Tuan.

“In particular, units need to strengthen the processing of clean coal from non-coal products to create a source for coal processing and blending; continue to implement the “Three-pronged approach” strategy: Mechanization, Automation, and Informatization in production lines; research and invest in synchronized mechanized lines for coal mining in longwall mining, and mechanized coal extraction in longwall mining with flexible support; and promote investment in large-capacity synchronized equipment lines in open-pit mines to improve the efficiency of loading, unloading, and transportation,” Mr. Nguyen Van Tuan emphasized.

In addition, units are also required to review and supplement regulations/procedures related to coal operation, business, and quality management in accordance with regulations, with the production, screening, blending, and processing units being ultimately responsible for product quality.


Source: https://nhandan.vn/tkv-phan-dau-dat-san-luong-hon-105-trieu-tan-than-sach-trong-quy-ii2025-post875962.html


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Admire the dazzling churches, a 'super hot' check-in spot this Christmas season.
The 150-year-old 'Pink Cathedral' shines brightly this Christmas season.
At this Hanoi pho restaurant, they make their own pho noodles for 200,000 VND, and customers must order in advance.
The Christmas atmosphere is vibrant on the streets of Hanoi.

Same author

Heritage

Figure

Enterprise

The 8-meter-tall Christmas star illuminating Notre Dame Cathedral in Ho Chi Minh City is particularly striking.

News

Political System

Destination

Product