Vietnam.vn - Nền tảng quảng bá Việt Nam

Simultaneous commencement of highway projects

Báo Thái BìnhBáo Thái Bình14/06/2023


Simultaneous commencement of highway projects

Tuesday, June 13, 2023 | 20:09:18

62 views

Four inter-regional expressway construction projects and the Ho Chi Minh City Ring Road 3 project will be simultaneously started on June 17 and 18 under the Prime Minister's direction.

Ring Road 3 is 76.34 km long, passing through Ho Chi Minh City, Dong Nai, Binh Duong and Long An provinces. Photo: NLĐ

Based on the proposal of the Ministry of Transport, the Prime Minister agreed to simultaneously start construction of 4 component projects of the Chau Doc - Can Tho - Soc Trang expressway project on June 17, in which the main starting point is in An Giang.

The Chau Doc - Can Tho - Soc Trang Expressway Project has a total route length of more than 188 km. Of which, the route through An Giang province is 56.7 km; Can Tho city is 37.7 km; Hau Giang province is 37.7 km and Soc Trang province is 56.1 km.

Phase 1 of the project is invested with a scale of four lanes, arranging intermittent emergency lanes, preliminary land use demand is about 1,205 hectares. Total investment is 44,691 billion VND.

Khởi công đồng loạt các dự án cao tốc - Ảnh 1.

Chau Doc - Can Tho - Soc Trang Expressway is the first horizontal expressway in the Mekong Delta. Photo: PLO

Along with that, the Prime Minister also agreed to organize the simultaneous groundbreaking of the Ho Chi Minh City Ring Road 3, Bien Hoa - Vung Tau Expressway, and Khanh Hoa - Buon Ma Thuot Expressway projects on June 18, in which the main starting point is in Ho Chi Minh City.

Ring Road 3 is 76.34 km long, passing through Ho Chi Minh City, Dong Nai, Binh Duong and Long An provinces. The project is expected to create regional connectivity, promoting economic and social development in the Southern Key Region.

The Bien Hoa - Vung Tau Expressway Project is over 53km long, passing through Dong Nai and Ba Ria - Vung Tau provinces with 3 component projects. Of which, the section passing through the province is over 34km long, divided into two component projects. The total investment of the project is over 17.8 trillion VND. Component project 1, invested by the Provincial People's Committee, is about 16km long.

The Khanh Hoa - Buon Ma Thuot Expressway Project has a total length of 117.5km, divided into 3 component projects. The project starts at the intersection between National Highway 26B and National Highway 1 (Nam Van Phong Port area, Khanh Hoa province) and ends at the intersection with Ho Chi Minh Road, the eastern bypass of Buon Ma Thuot City.

According to   vtv.vn



Source link

Comment (0)

No data
No data

Same tag

Same category

Ho Chi Minh City attracts investment from FDI enterprises in new opportunities
Historic floods in Hoi An, seen from a military plane of the Ministry of National Defense
The 'great flood' on Thu Bon River exceeded the historical flood in 1964 by 0.14 m.
Dong Van Stone Plateau - a rare 'living geological museum' in the world

Same author

Heritage

Figure

Enterprise

Admire 'Ha Long Bay on land' just entered the top favorite destinations in the world

News

Political System

Destination

Product