On December 19th, in Liem Tuyen ward, Ninh Binh province, Deputy Prime Minister Le Thanh Long attended the inauguration ceremony of the second facilities of Bach Mai Hospital and Viet Duc Friendship Hospital. Each hospital project has a capacity of 1,000 beds and a total investment of 5,000 billion VND.
To date, the construction of the two hospitals has been completed, meeting quality, technical, and aesthetic requirements, with a total floor area of over 235,000 square meters.
The construction was carried out in accordance with current standards and regulations; meeting the stringent requirements of specialized medical facilities; ensuring safety, uniformity, modernity, and environmental friendliness.
The procurement and installation of medical equipment has yielded positive results. Many advanced, modern, and high-quality medical devices, compatible with the model of tertiary hospitals, have been purchased and received in accordance with regulations.
The equipment systems for diagnostic imaging, laboratory testing, emergency resuscitation, and advanced surgery meet the high professional requirements of Bach Mai Hospital and Viet Duc Friendship Hospital; creating an important foundation for the two hospitals to implement advanced and modern techniques to effectively serve the health care needs of the people.
Source: https://www.vietnamplus.vn/khanh-thanh-co-so-2-benh-vien-bach-mai-va-viet-duc-post1084109.vnp








Comment (0)