Vietnam.vn - Nền tảng quảng bá Việt Nam

My Thoi Ward begins construction of 3 Ut Oi bridges.

On the morning of January 4th, the People's Committee of My Thoi ward (An Giang province) held a groundbreaking ceremony for the construction of three bridges: Ut Oi 5, 6, and 7, crossing residential areas in three hamlets: Hung Thanh, Long Hung 1, and Tay An, My Thoi ward.

Báo An GiangBáo An Giang04/01/2026

Đại biểu động thổ khởi công công trình Representatives participated in the groundbreaking ceremony for the construction project.

Accordingly, the three bridges, Ut Oi 5, 6, and 7, will be constructed with reinforced concrete, ranging in length from over 25m to nearly 45m and in width from 5m to 6.5m. The total estimated cost for the three bridges is over 8 billion VND, funded by donations from Mr. Nguyen Minh Luong (Ut Oi), solicited by the My Thoi Ward People's Committee; and additional materials and labor contributed by Chau Thoi 620 Concrete Joint Stock Company and the local people. Construction of each bridge is expected to take approximately 60 days.

Three new bridges have been built to replace the old, dilapidated bridges, which were mostly makeshift iron bridges with narrow widths... no longer suitable or safe for the current traffic needs of the people.

Text and photos: NGUYEN HUNG

Source: https://baoangiang.com.vn/phuong-my-thoi-khoi-cong-xay-dung-3-cay-cau-ut-oi-a472445.html


Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Same author

Heritage

Figure

Enterprise

News

Political System

Destination

Product

Happy Vietnam
Walk in peace

Walk in peace

Dong Nai City undergoes transformation.

Dong Nai City undergoes transformation.

Morning mist at Thong Hue

Morning mist at Thong Hue