Vietnam.vn - Nền tảng quảng bá Việt Nam

Temporarily stop collecting tolls on the road connecting Noi Bai - Lao Cai expressway to Sa Pa

Báo Đại biểu Nhân dânBáo Đại biểu Nhân dân19/03/2024


Accordingly, the Provincial People's Committee agreed with the proposal of the Department of Transport to temporarily suspend toll collection (both directions) for the project to build a road connecting Noi Bai - Lao Cai Expressway to Sa Pa during the road closure period from March 14, 2024 to April 10, 2024.

At the same time, the Provincial People's Committee requires the project enterprise to have a plan to divide traffic, guide vehicles participating in traffic and solutions to ensure traffic safety on the route, and widely inform organizations and individuals.

Temporarily stop collecting tolls on the road connecting Noi Bai - Lao Cai expressway to Sa Pa -0
Mong Sen Bridge project, the highest overpass in Vietnam. Photo: ITN

After the above time, if the safe and smooth operating conditions are not ensured, toll collection must be stopped until Provincial Road 155 ensures normal operating conditions. After completing the construction of related items and ensuring the safe operating conditions of the route, the project enterprise shall report to the Lao Cai Provincial People's Committee (through the Department of Transport) to continue to allow toll collection according to regulations.

The contractor focuses on completing the XL08 package according to the project contract schedule and the signed contract appendices. The construction process must ensure safety, not affect the normal exploitation and operation of the project and properly implement the approved contents. Urgently prepare the Feasibility Study Report to adjust the project to submit to the competent authority for approval according to regulations.

Lao Cai Provincial People's Committee requests the Department of Transport, Lao Cai - Sa Pa BOT Investment Joint Stock Company and related units to urgently organize the implementation of the above contents.

+ Previously, the route connecting Noi Bai - Lao Cai Expressway to Sa Pa officially opened to traffic on September 22, 2023, on the occasion of the 120th anniversary of Sa Pa tourism . This route helps shorten the travel time from Lao Cai city to Sa Pa by about 20 minutes and avoids many dangerous curves.



Source

Comment (0)

No data
No data
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan

Heritage

Figure

Business

No videos available

News

Political System

Local

Product