Vietnam.vn - Nền tảng quảng bá Việt Nam

Lam Dong invites bids for Bao Loc - Lien Khuong expressway project

Lam Dong's Bao Loc - Lien Khuong Expressway project is part of the expressway connecting Da Lat and Ho Chi Minh City.

Báo Tuổi TrẻBáo Tuổi Trẻ09/05/2025

Lâm Đồng mời thầu dự án cao tốc Bảo Lộc - Liên Khương - Ảnh 1.

Bao Loc - Lien Khuong Expressway is part of the expressway system from Dau Giay to Lien Khuong according to the planning approved by the Prime Minister - Illustration photo ChatGPT

On May 9, Lam Dong Provincial People's Committee issued a decision approving the bidding documents to select investors for the Bao Loc - Lien Khuong Expressway construction investment project under the public-private partnership (PPP) method, phase 1.

Previously, on March 31, Mr. Tran Hong Thai, Chairman of Lam Dong Provincial People's Committee, signed a decision approving the investment project to build the Bao Loc - Lien Khuong expressway connecting the south of Lam Dong province with Da Lat city after connecting to the Lien Khuong - Prenn expressway.

According to the design, this highway will start from Loc Phat ward (Bao Loc), coinciding with the end point of Tan Phu - Bao Loc highway (km125+675).

The end point of the route will intersect with Lien Khuong - Prenn expressway (km208+650) in Hiep Thanh commune, Duc Trong district, Lam Dong province.

The total length of the entire route is about 73.62km, with a design speed of 100km/h. According to calculations, the total investment for the entire route is more than 17,000 billion VND.

The Lam Dong Provincial Transport Project Management Board is assigned to organize the selection of investors, strictly complying with legal regulations. The Lam Dong Provincial Department of Finance is assigned to take full responsibility for the content of appraisal and approval.

Bao Loc - Lien Khuong Expressway is part of the expressway system from Dau Giay to Lien Khuong according to the planning approved by the Prime Minister.

According to Lam Dong Provincial People's Committee, the project will improve connectivity with the national transport network, shorten the time to connect the Central Highlands provinces with the key economic region in the South and economic, social and industrial centers along National Highway 20; improve the capacity of transporting goods and foreign trade, meet the increasing demand, reduce congestion and traffic accidents on National Highway 20 which is currently overloaded.

Currently, Lam Dong province still has the Tan Phu - Bao Loc expressway project awaiting investment approval from the Government. The route is expected to be 66km long, 17m wide with 4 lanes, and a total investment of 17,200 billion VND.

When this route is formed, it will seamlessly connect Ho Chi Minh City with Da Lat City through the expressways Dau Giay - Tan Phu, Tan Phu - Bao Loc, Bao Loc - Lien Khuong, Lien Khuong - Prenn.

Recently, Khanh Hoa and Lam Dong provinces have submitted a proposal to the Prime Minister to invest in the Nha Trang - Da Lat expressway before 2030.

Read more Back to Topics
MAI VINH

Source: https://tuoitre.vn/lam-dong-moi-thau-du-an-cao-toc-bao-loc-lien-khuong-20250509175102566.htm


Comment (0)

No data
No data

Same category

Many beaches in Phan Thiet are covered with kites, impressing tourists.
Russian military parade: 'Absolutely cinematic' angles that left viewers stunned
Watch Russian fighter jets perform spectacularly at the 80th Anniversary of Victory Day
Cuc Phuong in butterfly season – when the old forest turns into a fairyland

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product