Regarding the petition of many households about the need to dredge the T23-2-2T drainage canal along the left bank of the East main canal, the section passing through Hung Thuan commune, Trang Bang town to drain water for Ba Cum field and related agricultural land areas, recently, the Southern Irrigation Exploitation Company Limited (the Company) sent a document to the Ministry of Agriculture and Rural Development ( MARD ) for comments.
A corner of Ba Cum field seen from above (drainage canal T23-2-2T on the left side of the main East canal and adjacent to the field (photo taken on September 26, 2024)
Specifically, in order to effectively carry out natural disaster prevention and search and rescue work, in early 2024, the Company coordinated with the Department of Agriculture and Rural Development and related units to inspect and review the current status of construction items in the irrigation system.
Thereby, the report unanimously proposed that the People's Committee of Tay Ninh province support funding to repair 3 necessary construction items that need urgent repair, to ensure the safety of irrigation works during the rainy and stormy season, serving traffic activities and the management and operation of the Dau Tieng - Phuoc Hoa irrigation system.
In particular, the left bank road surface of Phuoc Hoi - Ben Dinh drainage canal from K3+560 - K4+400 needs to be repaired; the right bank road surface of the West main canal from K8+640 - K10+100 also needs to be repaired; the T23-2-2T drainage canal on the left bank of the East main canal needs to be dredged to drain water for Ba Cum field and related agricultural land areas. After consideration, Tay Ninh Provincial People's Committee has approved a financial support of 3 billion VND from the 2024 economic career source - irrigation career (flood and storm prevention and control).
[embed]https://www.youtube.com/watch?v=59hUHcEY1wA[/embed]
To ensure compliance with regulations, as well as timely implementation of the above items on schedule and with quality, the Company has sent a document requesting the Ministry of Agriculture and Rural Development to approve the policy for repair. Accordingly, the Company is assigned to approve the technical economic report, organize the selection of contractors, make final settlement with competent authorities according to regulations and record it in the 2024 revenue plan.
According to the detailed budget allocation table for each project item attached to the request document sent to the Ministry of Agriculture and Rural Development, the budget for dredging the T23-2-2T drainage canal alone is about 855 million VND. Mr. Nguyen Huu Manh, Deputy Director of Dau Tieng - Phuoc Hoa Branch of the Southern Irrigation Exploitation Company Limited, said that after the Company receives the official response document from the Ministry of Agriculture and Rural Development, it will proceed to implement the project according to regulations.
Quoc Son
Source: https://baotayninh.vn/nao-vet-kenh-tieu-de-thoat-nuoc-cho-canh-dong-ba-cum-xa-hung-thuan--a179708.html
Comment (0)