• Support for the construction of 230 septic toilets.
  • Expedite progress and ensure the quality of school toilet construction.
  • Examination center number 18 has completed preparations for the 2026 High School Graduation Examination.
  • Dam Doi Commune is ready for the 2026 High School Graduation Exam.
  • Expedite the construction of toilets in schools.

The working group conducted a field survey of the facilities at Mai Thanh The Primary and Secondary School, Vinh Loi Commune Health Station (Nha Dai Hamlet), and inspected the preparations for the 2026 high school graduation exam at Le Van Dau High School (Xeo Chich Hamlet).

Vice Chairman of the Provincial People's Committee Nguyen Minh Luan (far left) inspects the facilities at Mai Thanh The Primary and Secondary School.

At Mai Thanh The Primary and Secondary School, the delegation focused on inspecting the progress of essential projects such as toilets, clean drinking water systems, and surveying the need for additional investment to ensure adequate teaching and learning conditions for teachers and students. These are areas of particular concern to the province, aiming to build a safe and friendly school environment that meets the requirements of educational reform.

According to reports, the school still has 4 teachers who do not meet the required professional qualifications; the facilities are dilapidated, and even the most basic teaching equipment is lacking. In particular, the swimming pool, which was invested in for the school, is currently not in use due to a lack of water filtration equipment and needs to be rectified soon.

During a survey at the Vinh Loi Commune Health Station, the working group noted numerous difficulties regarding organizational structure, personnel, and job positions; obstacles in the management and supply of medicines, vaccines, chemicals, and medical equipment; as well as operational funding and infrastructure conditions.

Vice Chairman of the Provincial People's Committee Nguyen Minh Luan noted that investment in health stations must be linked to improving the quality of primary healthcare, building trust so that people choose to seek treatment locally, and contributing to reducing the burden on higher-level facilities.

Vice Chairman of the Provincial People's Committee Nguyen Minh Luan conducts a field survey at the Vinh Loi Commune Health Station.

The head of the Vinh Loi Commune Health Station reported to the working group on the difficulties regarding facilities, personnel, and medical equipment.