Rest stops in the Northern region include: VEC Station Km227 (Cau Gie- Ninh Binh Expressway), Xuan Khiem and Xuan Cuong Stations at Km269 (Cao Bo-Mai Son Expressway), temporary rest stop Km329+700 Mai Son-National Highway 45 Expressway, temporary rest stop Km427+035 Nghi Son-Dien Chau Expressway.
This section has 4 component projects including: Mai Son-National Highway 45, National Highway 45-Nghi Son, Nghi Son-Dien Chau, Dien Chau-Bai Vot. At the exit/entry branches of the intersection with the current national highways, there are gas/oil stations and temporary rest areas to serve the needs of the people.
Specifically, the Mai Son-National Highway 45 Expressway Project includes: Gia Mieu Intersection Km295+507 intersecting with National Highway 217B; Ha Linh Intersection Km306+318 intersecting with National Highway 217; Thieu Giang Intersection Km315+380 intersecting with the connecting route of National Highway 1-National Highway 45; Dong Xuan Intersection Km327+800 intersecting with the connecting route of National Highway 45-National Highway 47; Dong Thang Intersection Km335+400 intersecting with the connecting road from Thanh Hoa city to Tho Xuan Nghi Son road.
The National Highway 45-Nghi Son Expressway Project has 2 intersections: Van Thien Intersection Km351+310 intersects with the National Highway 45-Nghi Son-Tho Xuan road connection; Nghi Son Intersection Km379+550 intersects with Nghi Son-Bai Tranh road.
Nghi Son-Dien Chau Expressway Project has 3 intersections: Quynh Vinh intersection (Km390+200) intersects with National Highway 48D; Quynh My intersection (Km405+600) intersects with National Highway 48B; Dien Cat intersection (Km429+715) intersects with National Highway 7.
Dien Chau-Bai Vot Expressway Project has 3 intersections: Nghi Phuong Intersection Km445+897 intersects with National Highway 7C; Hung Tay Intersection Km458+796 intersects with National Highway 46B; Bai Vot Intersection Km479+120 intersects with National Highway 8A.

In the Central region, there are 9 expressway component projects including: Ham Nghi-Vung Ang, Vung Ang-Bung, Bung-Van Ninh; Van Ninh-Cam Lo, Cam Lo-La Son; La Son-Hoa Lien; Hoa Lien-Tuy Loan; Da Nang -Quang Ngai, Van Phong-Nha Trang.
At the exit/entry branches of the intersections of these highways with existing roads, there are gas stations and shops serving people's needs.
In particular, the Ham Nghi-Vung Ang expressway project has 3 intersections: Cam Quan Km527+580; Ky Trung Km555+509 intersects with DH139; National Highway 12C Km568+126 intersects with National Highway 12C.
The Vung Ang-Bung expressway project has 3 intersections: Tien Chau-Van Hoa at Km597+900; National Highway 12A intersection at Km624+224; Quang Hop intersection at Km684+090.
Bung-Van Ninh project has 4 intersections including: Cu Nam at Km626+690; Viet Trung at Km643+480; Nhat Le 2 at Km653+850; intersection 9B at Km673+750.
The Van Ninh-Cam Lo project has 4 intersections: Intersection 9C at Km690+200 intersects with Ho Chi Minh road; Intersection 9D at Km713+276.5 intersects with National Highway 9D to Ho Chi Minh road; Intersection DT75 at Km727+319 intersects with Provincial Road 575 to Ho Chi Minh road; Intersection 9A at Km740+884 intersects with National Highway 9A to Ho Chi Minh road.
The Cam Lo-La Son project has now arranged temporary rest stops at Km64+200 on the left side of the route and Km77+800 on the right side of the route.
The La Son-Hoa Lien project has arranged a temporary rest stop at Km1+250 on the left side of the route. In addition, there is an intersection at Km13+280 of Ho Chi Minh road, La Son-Tuy Loan section, intersecting with provincial road 14B; Hoa Lien intersection at Km65+802 intersecting with the route to Hai Van tunnel and the Hoa Lien-Tuy Loan expressway. At the exit/entry branches of the intersection with these routes, there are gas/oil stations and shops.
The Hoa Lien-Tuy Loan project has 3 intersections, including: Km66+00 intersection adjacent to Hoa Lien intersection (the end point of La Son - Hoa Lien route); Hoang Van Thai intersection Km73+750 intersection with Hoang Van Thai street; Km77+472 intersection adjacent to Tuy Loan intersection (the starting point of Da Nang-Quang Ngai route).
The Da Nang-Quang Ngai project has 6 intersections: Tuy Loan Km0+00; Phong Thu Km13+310; Ha Lam Km40+880; Tam Ky Km64+460; Chu Lai Km82+990; Bac Quang Ngai Km123+700; Quang Ngai Km130+502; National Highway 1 Intersection Km139+204.
Van Phong-Nha Trang project has 3 intersections: Co Ma connecting with National Highway 1; National Highway 26 intersection Km332+100; Van Gia intersection Km299+800.
The Southern region has 4 component projects including: Nha Trang-Cam Lam; Cam Lam-Vinh Hao; Vinh Hao-Phan Thiet; Phan Thiet-Dau Giay expressway Km47+500 with corresponding temporary works at Km33+930 (both sides); Km113; Km205+092; Km47+500.
The Nha Trang-Cam Lam project also has 4 intersections: National Highway 27C intersection Km5+783; Suoi Dau Km14+755; Cam Lam Km30+260; National Highway 27B intersection km52+892.
Cam Lam-Vinh Hao project has 2 intersections: Du Long Km70+194; intersection Km92+815. Vinh Hao-Phan Thiet project has 5 intersections: Vinh Hao-Km134+700; Cho Lau-Km162+777; Dai Ninh-Km178+800; Ma Lam-Km208+700; Phan Thiet-Km234+617.
Phan Thiet-Dau Giay Project Km47+500 has 7 intersections including: Ba Bau connecting with National Highway 1 (Km0+000); intersection with National Highway 55; Intersection with Provincial Road 720 (Km38+088); intersection with National Highway 1 (Km62+997.16); intersection with Provincial Road 765 Km69+463.71); intersection with National Highway 56 (Km84+136.34); intersection with Ho Chi Minh City-Long Thanh-Dau Giay Expressway (Km99+000).
At the entrances/exits of the above intersections, there are gas stations and temporary rest areas to serve the needs of the people.
Source: https://cand.com.vn/Giao-thong/chi-tiet-cac-tram-dung-nghi-tram-xang-dau-tren-cao-toc-phuc-vu-dip-le--i779789/