Vietnam.vn - Nền tảng quảng bá Việt Nam

Hanoi's most modern park has been renovated and repaired with over 66 billion VND.

Báo Dân ViệtBáo Dân Việt22/02/2025

Opened in 2014, Cau Giay Park is one of the most modern and well-built parks in the capital. Faced with serious degradation, Cau Giay Park is being renovated and repaired to better meet the entertainment needs of the people.


Hanoi's most modern park has been renovated and repaired with over 66 billion VND.

Saturday, February 22, 2025 09:43 AM (GMT+7)

Opened in 2014, Cau Giay Park is one of the most modern and well-built parks in the capital. Faced with serious degradation, Cau Giay Park is being renovated and repaired to better meet the entertainment needs of the people.

img

Cau Giay Park is located on Thanh Thai Street (Dich Vong Ward, Cau Giay District, Hanoi) with an area of about 6,540 m2, the initial investment capital was 8 billion VND from socialized capital. At that time, Cau Giay Park with 3 areas including children's play area, sports area, lake area and square became one of the ideal destinations, attracting many people in the capital to come to play and exercise.

img

However, after a long time of operation, many items at Cau Giay Park have seriously degraded, posing a potential safety risk to residents, especially children. The most seriously degraded area is the children's playground. Here, the artificial grass in many locations has been torn and peeled off in large pieces, revealing hard, uneven concrete patches.

img

The paving bricks on some walking paths in Cau Giay Park are damaged and broken.

img

Faced with the state of degradation, the People's Committee of Cau Giay District has approved the construction design to be implemented after the basic design (construction drawing design - estimate) of the project to renovate and repair Cau Giay Park with a total investment of 66 billion 280 million VND. In the photo is the perspective of the project to renovate and repair Cau Giay Park.

img

It is known that the scale of the project includes upgrading the park with an area of 95,282m2; Lake area of 14,808m2; Construction area including: rest huts, toilets... about 899m2.

img

Currently, the construction unit is clearing the first items of the project.

img

Construction area is cordoned off and warning signs are posted.

img

Many trees in the park are trimmed.

img

After renovation, Cau Giay Park promises to become one of the greenest, cleanest and most beautiful parks in Hanoi.

img

The project is expected to be completed in October 2025.

Pham Hung



Source: https://danviet.vn/cong-vien-hien-dai-bac-nhat-ha-noi-duoc-chi-hon-66-ty-dong-de-cai-tao-sua-chua-20250221115900868.htm

Comment (0)

No data
No data
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together
Hanoi is strange before storm Wipha makes landfall
Lost in the wild world at the bird garden in Ninh Binh
Pu Luong terraced fields in the pouring water season are breathtakingly beautiful
Asphalt carpets 'sprint' on North-South highway through Gia Lai
PIECES of HUE - Pieces of Hue

Heritage

Figure

Business

No videos available

News

Political System

Local

Product