Performing the ribbon cutting ceremony to inaugurate Ngoc Mai bridge
Ngoc Mai Bridge (Nhon Loi 3) connecting key traffic routes in Nhon Loc hamlet was completed and put into use after 4 months of construction.
The bridge has a reinforced concrete structure, 32m long, 4m wide, and a load capacity of over 8 tons. The total value of the project is over 490 million VND. Of which, the family of Mr. Andrew (Vo Van Ngoc) and Mrs. Doan Kim Mai, residing in Nhon Loc hamlet, sponsored 350 million VND; the rest was contributed by the Charity Bridge Construction Team and the People...
Presenting a certificate of gratitude to the family of Mr. Andrew (Vo Van Ngoc) and Mrs. Doan Kim Mai
Awarding certificates of merit to individuals and groups contributing to the construction of traffic bridges
On this occasion, the People's Committee of Nhon My commune awarded certificates of merit to 1 collective and 5 individuals with achievements in contributing to the construction of rural traffic bridges.
HANH CHAU
Source: https://baoangiang.com.vn/khanh-thanh-cau-ngoc-mai-nhon-loi-3-xa-nhon-my-a424675.html
Comment (0)