Vietnam.vn - Nền tảng quảng bá Việt Nam

Thanh Thang Cement operates line 5, capacity 2.3 million tons/year

Báo Đầu tưBáo Đầu tư18/09/2024


Thanh Thang Cement operates line 5, capacity 2.3 million tons/year

The firing ceremony of kiln line No. 5 has just been carried out by Thanh Thang Group Cement Joint Stock Company, officially putting into operation the production line of sulfate-resistant saline-resistant cement in Thanh Liem district, Ha Nam province.

Kiln firing ceremony of Thanh Thang cement line 5 in Ha Nam.
Kiln firing ceremony of Thanh Thang cement line 5 in Ha Nam.

Thanh Thang Group Cement Joint Stock Company has just held a kiln-firing ceremony, officially putting into operation line 5, specializing in producing high-quality cement products and sulfate-resistant salt-resistant cement in Ha Nam. This event has brought the Group's total cement capacity to 10 million tons.

Line 5 is designed using the dry method, with a rotary kiln system and a 2-branch heat exchange tower, 5 cyclone floors, a decomposition chamber, burning 100% low-volatility coal, and a power generation system utilizing residual heat, with a capacity of 10MW.

6 years ago, on December 28, 2018, the Prime Minister approved lines 4 and 5 of Thanh Thang Cement, with a capacity of 2.3 million tons/year each, to supplement the Vietnam Cement Industry Plan from 2011 - 2020, with a vision to 2030.

Specifically, the Prime Minister agreed to add 2 production lines of Thanh Thang Cement Factory, Ha Nam Province (production lines No. 4 and No. 5), each with a capacity of 2.3 million tons of cement/year, combining waste treatment to protect the environment and creating high-quality cement products, sulfate-resistant saline cement for construction of coastal and island projects, to the Vietnam Cement Industry Development Plan for the period 2011 - 2020 and orientation to 2030.

Line 4 will be put into operation after 2021 and line 5 after 2025.

In December 2021, Thanh Thang Group Cement Joint Stock Company put into operation line number 4.

Line 4 of Thanh Thang Cement Factory has a total investment of 4,951 billion VND; produces sulfate-resistant saline cement with a kiln capacity of 6,000 tons of clinker/day, and a capacity of 2.3 million tons of cement/year.

Putting line No. 5 into operation not only increases the production capacity of Thanh Thang Group Cement Joint Stock Company to 10 million tons, but also creates new advantages in the production and business of the enterprise, helping to meet the demand for sulfate-resistant saline cement products serving the construction of coastal and island projects nationwide.



Source: https://baodautu.vn/xi-mang-thanh-thang-van-hanh-day-chuyen-5-cong-suat-23-trieu-tannam-d225029.html

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product