Project 01: CA NA LNG POWER PROJECT

Illustrative image

• Project name: Ca Na LNG Power Plant Project

• Investment location: Phuoc Diem Commune, Thuan Nam District.

• Investment objective: To construct an LNG gas-fired power plant with a capacity of 1,500MW.

• Area: 270.2 hectares.

• Land origin: State-managed land; land managed by organizations, households, and individuals.

• Current land status: Land used for salt production, land and assets on the land used for agricultural production by households, and protective forest land. The total area is 270.2 hectares, of which: Land area is 37.9 hectares. Water surface area is 232.3 hectares.

• Projected investment capital: 51,793 billion VND.

• Compliance with land use planning, construction planning, sectoral planning, etc.:

- In accordance with the National Power Development Plan for the period 2021-2030, with a vision to 2050, approved by the Prime Minister in Decision No. 500/QD-TTg dated May 15, 2023, and the Provincial Power Development Plan for the period 2021-2030, with a vision to 2050.

- In accordance with the Land Use Planning until 2030 of Thuan Nam district, approved by the Provincial People's Committee in Decision No. 399/QD-UBND dated July 5, 2022.

- In accordance with the detailed construction plan for the LNG power plant complex area as per Decision No. 299/QD-UBND dated October 24, 2020.

- It is already included in the Area VIII Planning.

Project 02: PHUOC HOA PUMPED STORAGE HYDROPOWER PROJECT

Illustrative image

• Project name: Phuoc Hoa Pumped Storage Hydropower Project.

• Investment location: Bac Ai and Ninh Son districts.

• Investment objective: To construct a pumped storage hydroelectric power plant with a capacity of 1,200 MW.

• Area: 136.97 hectares.

• Land origin: The land is managed by Tan Tien Forestry Company.

• Current land status: Forest land.

• Projected investment capital: 22,865 billion VND.

• Conformity with land use planning, construction planning, sectoral planning, etc.: In accordance with the National Power Development Plan for the period 2021-2030, with a vision to 2050, approved by the Prime Minister in Decision No. 500/QD-TTg dated May 15, 2023, and the provincial planning for the period 2021-2030, with a vision to 2050.

Project 03: DAM NAI 3 WIND POWER PROJECT

Illustrative image

• Project name: Dam Nai 3 Wind Power Project.

• Investment location: Thuan Bac and Ninh Hai districts,

• Investment objective: To construct a wind power plant with a capacity of 39.4MW.

• Area: 9.98 hectares.

• Land origin: Family-owned land.

• Current land status: Agricultural land.

• Estimated investment capital: 872 billion VND.

• Compliance with land use planning, construction planning, sectoral planning, etc.:

- In accordance with the National Power Development Plan for the period 2021-2030, with a vision to 2050, approved by the Prime Minister in Decision No. 500/QD-TTg dated May 15, 2023, and the Provincial Power Development Plan for the period 2021-2030, with a vision to 2050.

Project 04: DAM NAI 4 WIND POWER PROJECT

Illustrative image

• Project name: Dam Nai 4 Wind Power Project.

• Investment location: Thuan Bac and Ninh Hai districts.

• Investment objective: To construct a wind power plant with a capacity of 27.6MW.

• Area: 9.8 hectares

• Land origin: Family-owned land.

• Current land status: Agricultural land.

• Projected investment capital: 1,649 billion VND.

• Conformity with land use planning, construction planning, sectoral planning, etc.: In accordance with the National Power Development Plan for the period 2021-2030, with a vision to 2050, approved by the Prime Minister in Decision No. 500/QD-TTg dated May 15, 2023, and the provincial planning for the period 2021-2030, with a vision to 2050.

Project 05: TRI HAI WIND POWER PROJECT

Illustrative image

• Project name: Tri Hai Wind Power Project.

• Investment location: Ninh Hai District.

• Investment objective: To construct a wind power plant with a capacity of 79.5MW.

• Area: 10 hectares.

• Land origin: Salt land managed by Tri Hai Salt Company.

• Current land status: Agricultural land, salt land.

• Projected investment capital: 2,760 billion VND.

• Conformity with land use planning, construction planning, sectoral planning, etc.: In accordance with the National Power Development Plan for the period 2021-2030, with a vision to 2050, approved by the Prime Minister in Decision No. 500/QD-TTg dated May 15, 2023, and the provincial planning for the period 2021-2030, with a vision to 2050.

Project 06: PHUOC DAN WIND POWER PROJECT

Illustrative image

• Project name: Phuoc Dan Wind Power Project.

• Investment location: Ninh Phuoc District.

• Investment objective: To build a wind power plant with a capacity of 45MW.

• Area: 17.85 hectares.

• Land origin: Land owned by households and individuals.

• Current land status: Agricultural land.

• Projected investment capital: 1,478 billion VND.

• Conformity with land use planning, construction planning, sectoral planning, etc.: In accordance with the National Power Development Plan for the period 2021-2030, with a vision to 2050, approved by the Prime Minister in Decision No. 500/QD-TTg dated May 15, 2023, and the provincial planning for the period 2021-2030, with a vision to 2050.

Project 07: BAU NGU LAKE WIND POWER PROJECT

Illustrative image

• Project name: Bau Ngu Lake Wind Power Project.

• Investment location: Thuan Nam District.

• Investment objective: To build a wind power plant with a capacity of 25.2MW.

• Area: 7.5 hectares.

• Land origin: Land owned by households and individuals.

• Current land status: Agricultural land.

• Estimated investment capital: 988 billion VND.

• Conformity with land use planning, construction planning, sectoral planning, etc.: In accordance with the National Power Development Plan for the period 2021-2030, with a vision to 2050, approved by the Prime Minister in Decision No. 500/QD-TTg dated May 15, 2023, and the provincial planning for the period 2021-2030, with a vision to 2050.

Project 08: UPPER ONG RIVER HYDROELECTRIC PROJECT 2

Illustrative image

• Project name: Thuong Song Ong 2 Hydropower Project

• Investment location: Luong Son commune and Tan Son town, Ninh Son district.

• Investment objective: To construct a hydroelectric power plant with a capacity of 7 MW.

• Area: 23.3 hectares.

• Land origin: Land owned by households and individuals.

• Current land status: Agricultural land, rivers and streams.

• Projected investment capital: 265,837 billion VND.

• Conformity with land use planning, construction planning, sectoral planning, etc.: It conforms to the provincial planning for the period 2021-2030 with a vision to 2050, approved by the Prime Minister in Decision No. 1319/QD-TTg dated November 10, 2023. Furthermore, it has been approved by the Ministry of Industry and Trade for inclusion in the national small hydropower planning in Decision No. 750/QD-BCT dated March 2, 2021.

Project 09: PHUOC HOA HYDROELECTRIC PROJECT

Illustrative image

• Project name: Phuoc Hoa Hydropower Project.

• Investment location: Bac Ai District.

• Investment objective: To construct a hydroelectric power plant with a capacity of 22MW.

• Area: 63.15 hectares.

• Land origin: Forest land managed by Tan Tien Forestry One-Member Limited Company, forest land managed by Phuoc Binh National Park Management Board, agricultural land of households, alluvial land along rivers, and river and stream land.

• Current land status: Forest land and agricultural land.

• Projected investment capital: 862,139 billion VND.

• Compliance with land use planning, construction planning, sectoral planning, etc.: The project has received approval for surveying from the Ninh Thuan Provincial People's Committee in document No. 2712/UBND-KT dated June 29, 2018, and has been added to the national small hydropower planning in Ninh Thuan province by the Ministry of Industry and Trade in Decision No. 4747/QD-BCT dated December 24, 2018, and supplemented with a plan for connecting to the national power grid in document No. 7969/BCT-DL dated October 21, 2020.

Source: Ninh Thuan Provincial Center for Investment, Trade and Tourism Promotion


Source

Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Same author

Heritage

Figure

Enterprise

News

Political System

Destination

Product

Happy Vietnam
The Gentle Charm of Hue

The Gentle Charm of Hue

Trang An Festival

Trang An Festival

The lagoon was abuzz with activity.

The lagoon was abuzz with activity.