
This move is considered a concrete and practical step in supporting officials, civil servants, public employees and workers from Binh Phuoc to work in Dong Nai. At the same time, it promotes regional connectivity, serves people's needs and socio -economic development between Binh Phuoc and Dong Nai provinces.
Specifically, this passenger transport route starts at Bien Hoa Bus Station and ends at Truong Hai Bus Station, with a total route length of 84km. The specific route goes through the following routes: DT741 - DT747 - Bui Huu Nghia Street - Hoa An Bridge - Nguyen Ai Quoc Street. The operating volume reaches 180 trips/month, with an average frequency of 30 minutes per trip (instead of the old interval of 45 minutes), contributing to improving connectivity and serving the travel needs between the two localities.

At the same time, Dong Nai Department of Construction also agreed with the proposal on departure times at Bien Hoa Bus Station at the following times: 5:00, 11:30 and 17:00, with a total of 90 trips/month for registered transport units.
Notably, to meet the increasing travel needs of officials, civil servants, public employees and workers from Binh Phuoc working in Dong Nai, Dong Nai Department of Construction proposed that Binh Phuoc Department of Construction direct transport units to review and adjust departure times to be more suitable to reality. The adjustment will be implemented from July 1, 2025.
Source: https://www.sggp.org.vn/dong-nai-mo-tuyen-van-tai-ket-noi-binh-phuoc-phuc-vu-can-bo-cong-chuc-di-lai-post800544.html
Comment (0)