Accordingly, from 0:00 on May 28th, motorcycles, bicycles, and pedestrians are allowed to travel on Long Bien Bridge in both directions on the completed pedestrian walkways, motorcycle lanes, and bicycle lanes.
![]() |
From May 28th, vehicles were allowed to travel across Long Bien Bridge in both directions after two months of repairs. |
![]() |
According to observations, vehicles were seen crossing the Long Bien Bridge on the morning of May 28th. |
![]() |
| Previously, the Department of Construction announced a ban on vehicles from using Long Bien Bridge in both directions starting from March 28th to facilitate emergency repair work. |
![]() |
| Vehicles and pedestrians move along the newly smooth road surface. |
![]() |
| The reopening of the bridge is expected to help alleviate traffic pressure on nearby bridges and meet the transportation needs of people on both sides of the Red River. |
Source: https://www.qdnd.vn/xa-hoi/tin-tuc/ha-noi-chinh-thuc-thong-xe-cau-long-bien-1041631















Comment (0)