Accordingly, localities continue to implement Plan No. 82 of the People's Committee. The province should thoroughly handle the self-opened railway crossings. The relevant communes and wards should organize road surface repairs, add warning signs, stop lines, and speed bumps at damaged or missing level crossings. Warning signs should be installed in accordance with regulations at locations with automatic barriers. In addition, check and maintain warning signs and narrowing fences at existing self-opened crossings to prevent unauthorized removal or creation of new crossings.
The Department of Construction also requested Quang Ngai Transport Construction Joint Stock Company to repair road surfaces and add traffic signal systems at road intersections with railways on national highways and provincial roads. The full implementation of the above contents will contribute to ensuring safety for people and vehicles, minimizing the risk of accidents at railway-road intersections in the province.
Source: https://quangngaitv.vn/trien-khai-cong-tac-bao-dam-trat-tu-an-toan-giao-thong-duong-sat-tai-cac-diem-giao-cat-voi-duong-bo-6505484.html
Comment (0)