Vietnam.vn - Nền tảng quảng bá Việt Nam

Rebuilding Phong Chau pontoon bridge to serve people

Báo Xây dựngBáo Xây dựng18/10/2024


At noon on October 18, Phu Tho Provincial Police informed that at 12 noon on the same day, Brigade 249 stopped operating the ferry to build a pontoon bridge.

Previously, at around 8:30 a.m. on October 16, due to the high water level and high flow rate of the Red River, to ensure the safety of people and vehicles, Brigade 249 cut the bridge urgently.

Bắc lại cầu phao Phong Châu phục vụ người dân- Ảnh 1.

Brigade 249 rebuilt the pontoon bridge from 12 noon on October 18.

By the afternoon of October 16, pedestrians, motorbikes, scooters, and electric bicycles were traveling through Phong Chau bridge by ferry.

Unlike pontoon bridges that can allow cars and trucks to pass, military ferries only serve pedestrians and motorbikes.

Therefore, reinstalling Phong Chau pontoon bridge will more fully meet the huge river crossing needs of the people.

Traffic time through Phong Chau pontoon bridge is from 5:30 a.m. to 9:00 p.m. daily.

Currently, in addition to preparing for the installation of the pontoon bridge, authorities are still trying to search for the remaining four missing victims of the bridge collapse.



Source: https://www.baogiaothong.vn/bac-lai-cau-phao-phong-chau-phuc-vu-nguoi-dan-192241018143047483.htm

Comment (0)

Please leave a comment to share your feelings!

Same tag

Same category

Hanoi girls "dress up" beautifully for Christmas season
Brightened after the storm and flood, the Tet chrysanthemum village in Gia Lai hopes there will be no power outages to save the plants.
The capital of yellow apricot in the Central region suffered heavy losses after double natural disasters
Hanoi coffee shop causes a fever with its European-like Christmas scene

Same author

Heritage

Figure

Enterprise

Beautiful sunrise over the seas of Vietnam

News

Political System

Destination

Product