The investment project to build a grade-separated intersection between Ring Road 3.5 and Thang Long Avenue (Hoai Duc district) is invested by Hanoi city budget with a total investment of over 2,384 billion VND.
The construction scale of the intersection includes turbine branches combined with a direct tunnel from Le Trong Tan Street (Ha Dong) to National Highway 32, the centerline coincides with Le Trong Tan Street, arranging 4 lanes with a total length of 975m. The section under Thang Long Avenue is designed with a closed tunnel 150m long. On Le Trong Tan Street, an open tunnel is designed with a length of 157.5m, and a retaining wall 220m long.
Side National Highway 32 Open tunnel design 157.5m long, retaining wall 200m long. Prestressed reinforced concrete slab girder turbine branch bridge has length 2,357m/4 branches, bridge width 8.8m with two lanes, reinforced concrete retaining wall has total length 619m.
The project aims to complete the transport infrastructure system (framework infrastructure) according to the plan; connect exploitation with the invested and constructed transport infrastructure; serve the needs of goods circulation, production and people's travel needs, reduce traffic congestion, contribute to accelerating the formation of urban areas in the region, promote the socio-economic development of the capital.
On the same morning, Hanoi city also held an inauguration ceremony to open the extended Le Quang Dao road.
The investment project to build the extended Le Quang Dao road has a length of about 2,673m, with a total investment of more than 705 billion VND. The starting point is the intersection with Thang Long Avenue, in Me Tri ward (Nam Tu Liem district), the end point is at the boundary with Duong Noi urban area (Ha Dong district).
The route is designed according to inter-regional road standards, speed 60km/h. The cross-section is 40m; the section connecting to Thang Long Avenue (about 110m long) has a cross-section of 100m... The project ensures safety, quality and urban beauty, contributing to reducing traffic congestion on neighboring roads in the area, creating conditions for socio-economic development of the capital.
Source: https://baolangson.vn/ha-noi-khoi-cong-thong-xe-hai-du-an-giao-thong-quan-trong-5044551.html
Comment (0)