Rewarding groups and individuals who actively contributed to the construction of Can Thao bridge
Thanks to our sponsors
Ribbon cutting ceremony
Can Thao Bridge contributes to the successful implementation of the 1 million hectare high-quality rice project in the locality.
After a period of urgent construction, the project was completed with a reinforced concrete structure, 45m long, 4m wide, 5-ton load capacity, total construction cost of about 600 million VND, with the support of the Ho Chi Minh City Young Entrepreneurs Association.
Along with that, armed units such as the 330th Infantry Division, the 416th Armored Brigade (Military Region 9) and local people also contributed additional costs and labor days to carry out the project.
Can Thao Bridge was completed with practical significance to welcome the Party Congresses at all levels for the 2025 - 2030 term, commemorating the 50th anniversary of the Liberation of the South and National Reunification Day (April 30, 1975 - April 30, 2025). At the same time, it also helps facilitate people's travel, production, cultivation, and transportation of goods. Support localities to strengthen linkages and product consumption, contributing to the successful implementation of the 1 million hectare project of high-quality rice cultivation.
THANH TIEN
Source: https://baoangiang.com.vn/khanh-thanh-cau-can-thao-a418652.html
Comment (0)