Vietnam.vn - Nền tảng quảng bá Việt Nam

People are eager to experience, metro number 1 is crowded on weekends

Báo Giao thôngBáo Giao thông28/12/2024

On the first weekend since metro line No. 1 Ben Thanh - Suoi Tien was put into operation, thousands of people eagerly flocked to the stations to experience it.


Clip of people going to Ben Thanh station to take the metro, crowded.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 1.

On December 28, the first weekend since metro line No. 1 (Ben Thanh - Suoi Tien) was put into operation, thousands of people continued to visit the stations to experience it. Ben Thanh Station (District 1, Ho Chi Minh City) is still the station with the most visitors, stretching from the gate to the basement.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 2.

From early morning, thousands of people rushed to Ben Thanh station. According to the investigation of Giao thong Newspaper reporters, not only people in districts of Ho Chi Minh City, but also many other provinces such as Long An , Vinh Long, Tay Ninh... also took advantage of the weekend to go to the metro. This shows the attraction of the first metro line in Ho Chi Minh City.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 3.

Despite the long wait, most people were excited and took the opportunity to take souvenir photos while waiting. Employees of the Urban Railway Company No. 1 (the metro operator) continuously guided and divided the flow of people to ensure the number of people boarding the train.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 4.

Mr. Hoang Long (84 years old, living in Thu Duc City) happily said that he took many metro trips from the trial run until the official operation.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 5.
Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 6.
Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 7.

In the photo, people are sweating as they wait their turn to board the metro train at Ben Thanh station.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 8.

In addition to families taking their children to experience the metro, many students were also organized to go to Ben Thanh station on the weekend. Although the wait was long, the children were still very patient and eager.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 9.
Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 10.
Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 11.

Because of the overcrowding, it is difficult for people to fully experience the metro train. Most passengers (both the elderly and children) have to stand throughout the journey, without the opportunity to enjoy the scenery outside. The overcrowding also makes the air inside the train stifling.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 15.

However, passengers lucky enough to get a seat near the window still have the opportunity to enjoy the city view through the large glass panels. "The train is smooth and fast, I really like it. I can see the tallest building in Ho Chi Minh City and Suoi Tien when the train passes by," said Nhat Nam, a fourth grader.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 16.
Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 17.
Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 18.
Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 19.

During the 6 days of operation (from December 22 to December 27), Metro Line 1 welcomed 531,705 passengers. Each day, the metro line has 200 trains running, operating from 5:00 a.m. to 10:30 p.m. In the photo, many children are taken by their relatives to experience the metro.

Người dân háo hức trải nghiệm, metro số 1 đông nghẹt ngày cuối tuần- Ảnh 20.

On December 27, Metro Line 1 trains were temporarily suspended due to heavy rains, lightning, and thunderstorms. After checking and finding no abnormalities, the relevant units decided to allow the trains to resume operation.

TP.HCM mưa quá lớn, tuyến metro số 1 phải tạm dừng Heavy rain in Ho Chi Minh City, metro line 1 must be temporarily suspended

On the evening of December 27, Ho Chi Minh City experienced a very heavy rain accompanied by thunder and lightning. To ensure the safety of passengers during the initial operation, the Urban Railway Management Board and the operating unit decided to temporarily stop the trains and bring them back to the station.



Source: https://www.baogiaothong.vn/nguoi-dan-hao-huc-trai-nghiem-metro-so-1-dong-nghet-ngay-cuoi-tuan-192241228135755879.htm

Comment (0)

No data
No data
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?

Heritage

Figure

Business

No videos available

News

Political System

Local

Product