The delegation came to survey and inspect the actual landslide area on the North bank of Thu Doan canal.
The delegation came to survey and inspect the actual landslide area of the North bank of Thu Doan canal (Hamlet 1 Binh Duc, Binh Duc commune). The landslide point of the North bank of Thu Doan canal is more than 50m long, about 3m wide and about 1.5m deep, with a risk of further landslides in the coming time.
Landslides continue to occur
According to local residents, the landslide on the northern bank of Thu Doan canal has lasted for nearly 2 months, affecting the lives and psychology of surrounding households. At the same time, this is one of the main roads connecting Binh Duc commune with Thu Thua commune, so the landslide not only causes difficulties for daily life but also poses a potential danger to passing vehicles.
People are worried that if the landslide continues, it will endanger passing vehicles.
Through the survey, the Working Group determined that the landslide situation is at an urgent level. The Working Group will summarize, report and advise the province to consider allocating capital to promptly implement solutions to overcome and stabilize people's lives. The Group requested the Binh Duc Commune authorities to increase propaganda, at the same time, stretch ropes and put up warning signs to help people proactively prevent./.
Khanh Duy - Minh Tam
Source: https://baolongan.vn/khao-sat-tinh-trang-sat-lo-tai-xa-binh-duc-a200958.html
Comment (0)