Vietnam.vn - Nền tảng quảng bá Việt Nam

Close-up of the 740 billion VND road connecting 2 districts in Hanoi about to open to traffic

Báo Dân ViệtBáo Dân Việt16/03/2024


Overview of the road worth more than 740 billion VND connecting 2 districts in Hanoi about to open to traffic

Saturday, March 16, 2024 08:19 AM (GMT+7)

The extended Le Quang Dao Street is one of the key projects of Hanoi City, which started construction in the first quarter of 2023 and is expected to open to traffic in April 2024. Currently, the construction items are being accelerated.

Video : Le Quang Dao extended road connecting Nam Tu Liem district and Ha Dong district, Hanoi.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 1.

The Investment Project to build the extended Le Quang Dao road was approved by the Hanoi People's Council in Resolution No. 23/NQ-HDND dated September 23, 2021 with a total investment capital of more than 740 billion VND.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 2.

The extended Le Quang Dao Street is over 2.6 km long, with a cross-section of 40 m. The starting point connects with Le Quang Dao Street and Thang Long Avenue (in Me Tri Ward, Nam Tu Liem District). The end point is at the intersection with Le Trong Tan Street (Ha Dong District).

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 3.

According to Dan Viet reporters on the afternoon of March 15, the Le Quang Dao extended road project is progressing quite positively.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 4.

A bridge over the Nhue River is being built on the route. The construction of the bridge piers has been basically completed.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 5.

Currently, after more than 1 year of construction, the section from the intersection of Thang Long Avenue to Dai Linh Street (Me Tri Ward) has the best construction progress, and the first layer of asphalt has been paved.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 6.

Some items such as paving sidewalks, filling soil to separate and plant trees are being urgently implemented.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 7.

The typical road cross-section is 40 m, the section connecting to Thang Long Avenue (about 110 m long) has a cross-section width of 100 m.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 8.

However, the route passing through Trung Van and Dai Mo wards is in the process of clearing some power projects blocking the road, leveling the ground, and constructing the roadbed.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 9.

According to the design, the route will have inter-regional road standards, with a design speed of 60km/h.

Toàn cảnh tuyến đường trị giá hơn 740 tỷ đồng nối 2 quận ở Hà Nội sắp thông xe- Ảnh 10.

This is an important route connecting many large urban areas in the West of Hanoi such as: Vinhomes Smart City, Duong Noi, Louis City, FLC Premier...

Pham Hung



Source

Comment (0)

No data
No data

Heritage

Figure

Business

No videos available

News

Political System

Local

Product