Vietnam.vn - Nền tảng quảng bá Việt Nam

Dream Home Bien Hoa Riverside project with 30 floors has environmental documents approved

(DN) - On May 22, the Chairman of the Provincial People's Committee issued Decision No. 1670/QD-UBND approving the appraisal results of the environmental impact assessment report of the Hoa An Ward Apartment Project (Dream Home Bien Hoa Riverside) in Hoa An Ward, Bien Hoa City of Dream Home Hoa An Company Limited.

Báo Đồng NaiBáo Đồng Nai23/05/2025

Hoa An Ward, where the Dream Home Bien Hoa Riverside Project is being implemented. Illustrative photo
Hoa An Ward, where the Dream Home Bien Hoa Riverside Project is being implemented. Illustrative photo

According to the decision, the province's environmental protection requirements include: wastewater and garbage management; solid and hazardous waste management; ensuring noise and vibration during project construction and operation. Investors are required to take measures to reduce negative impacts on the environment and comply with environmental protection regulations during project implementation.

Dream Home Bien Hoa Riverside project has an area of about 9.3 thousand m², of which the area of land for apartment construction is 7.8 thousand m², including 30 floors, maximum 922 apartments, capable of accommodating more than 2 thousand people. In addition, within the scope of the project there is also a commercial service area and kindergarten.

The project's environmental protection works are: a wastewater treatment system with a capacity of 560m³/day; a domestic waste storage area (garbage collection room on basement 2) with an area of 10m²; each apartment floor has a domestic waste storage room with an area of 2m²; a hazardous waste storage area with an area of 10m² near the wastewater treatment system; and a green area of about 2,000 m².

The total preliminary investment of the project is more than 1,352 billion VND. The project is divided into 2 investment phases: Phase 1 from January 2024 to December 2025 will complete investment preparation and land procedures; Phase 2 from January 2026 to December 2029 will be constructed and completed.

Hoang Loc

Source: https://baodongnai.com.vn/tin-moi/202505/du-an-dream-home-bien-hoa-riverside-quy-mo-30-tang-duoc-duyet-ho-so-moi-truong-3520e93/


Comment (0)

No data
No data
Lost in the wild world at the bird garden in Ninh Binh
Pu Luong terraced fields in the pouring water season are breathtakingly beautiful
Asphalt carpets 'sprint' on North-South highway through Gia Lai
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'

Heritage

Figure

Business

No videos available

News

Political System

Local

Product