Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Hanoi invests 5,400 billion to build Ring Road 3 through Dong Anh

Ring Road 3 through Dong Anh district (Hanoi) is about 20.2km long, with a total estimated investment of VND 5,413 billion to be implemented in 2025 - 2028.

Báo Công an Nhân dânBáo Công an Nhân dân03/04/2025

The Hanoi People's Committee has just issued a decision approving the Investment Project to build the Ring Road 3 section through Dong Anh district.

The project is invested by the People's Committee of Dong Anh district, with a total estimated investment of VND 5,413 billion to be implemented in 2025 - 2028. The investment project belongs to group A and is a road and bridge traffic project, with a level I construction level.

The investment project aims to gradually complete the framework traffic infrastructure system of Dong Anh district according to the plan, and complete the closed Ring Road 3 route north of the Red River...

The scale of the project investment and construction is the Ring Road 3 in Dong Anh district with the starting point at the intersection with the new National Highway 3 and the ending point at the intersection with Vo Van Kiet Street. The cross-section scale is from 61m to 68m with 6 lanes for motor vehicles on the main route and 2 parallel roads...

Hanoi invests 5,400 billion to build Ring Road 3 through Dong Anh -0

Direction of Ring Road 3 through Dong Anh district, Hanoi (Photo: EIA Report).

According to the decision approving the location of Ring Road 3 in Dong Anh district prepared by the Hanoi Institute of Construction Planning and appraised by the Hanoi Department of Planning and Architecture, the project has a route length of about 20.2km. Route direction: Determined to be consistent with the General Construction Plan of the Capital, the Transport Plan of the Capital and the approved urban subdivision plans N2, N3, N5, N7, GN. Grade: urban main road.

Road cross-section scale: Typical cross-section width B = 68m including components: Main roadway 2x11.25m (6 lanes), service roadway 2x10.5m, sidewalks on both sides 2x8m and median strips, side dividers...

At the section passing through the residential area of ​​Thuong Phuc village, Bac Hong commune, the sidewalk adjacent to the railway station is locally narrowed to 4m, the cross-section width of road B = 64m (the cross-section components of the road remain unchanged) to minimize the impact on the existing residential area.

Along the route, 5 asterisk-shaped interchanges are identified, complete with cross-roads including: New National Highway 3, Old National Highway 3, Vo Nguyen Giap Street, Vo Van Kiet Street and Ring Road 4.

Source: https://cand.com.vn/Giao-thong/ha-noi-dau-tu-5-400-ty-lam-duong-vanh-dai-3-qua-dong-anh--i763918/


Comment (0)

No data
No data

Same category

Su 30-MK2 fighter jets drop jamming shells, helicopters raise flags in the capital's sky
Feast your eyes on the Su-30MK2 fighter jet dropping a glowing heat trap in the sky of the capital
(Live) General rehearsal of the celebration, parade, and march to celebrate National Day September 2
Duong Hoang Yen sings a cappella "Fatherland in the Sunlight" causing strong emotions

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product