Vietnam.vn - Nền tảng quảng bá Việt Nam

Construction of the nearly 2,200 billion VND Golden Canal Bridge connecting Bac Ninh and Hai Duong began

Việt NamViệt Nam22/09/2024


Prime Minister Pham Minh Chinh and delegates perform the groundbreaking ceremony of the Golden Canal Bridge project connecting Bac Ninh and Hai Duong provinces. Comrade Luu Van Ban, member of the Provincial Party Standing Committee, Vice Chairman of Hai Duong Provincial People's Committee, stands fourth from left.

On the afternoon of September 22, at the conference to announce the Planning and Investment Promotion of Bac Ninh province in 2024, the groundbreaking ceremony of the Project to invest in the construction of the Golden Canal Bridge and the roads at both ends of the bridge, connecting the two provinces of Bac Ninh and Hai Duong, took place.

The groundbreaking ceremony was changed from in-person to online and all expenses for the ceremony were transferred to support people affected by storm No. 3.

The project to invest in the construction of the Kenh Vang bridge and the approach roads at both ends of the bridge, connecting the two provinces of Bac Ninh and Hai Duong, has a route length of about 13.4 km, invested by the Bac Ninh Traffic Construction Project Management Board (Department of Transport), with a total cost of more than 2,182 billion VND. Of which, the Kenh Vang bridge construction project is 740 m long, 23.5 m wide, designed on a permanent scale, with a prestressed reinforced concrete structure; the approach roads at both ends of the bridge are 12.6 km long, with a road surface width of 15 m; construction locations are in Gia Binh, Luong Tai and Nam Sach districts (Hai Duong).

The Golden Canal Bridge is considered a symbol connecting the development corridor between Bac Ninh and Hai Duong provinces, contributing to the completion of traffic infrastructure, creating momentum for socio -economic development, attracting investment and improving the lives of people in the two provinces. It is expected that the Golden Canal Bridge will be completed in 2025 and the entire project will be completed on the occasion of the 30th anniversary of the re-establishment of Bac Ninh province (January 1, 1997 - January 1, 2027).

TB (according to Bac Ninh Newspaper)


Source: https://baohaiduong.vn/khoi-cong-xay-dung-cau-kenh-vang-noi-bac-ninh-va-hai-duong-gan-2-200-ty-dong-393775.html

Comment (0)

No data
No data
The moment the SU-30MK2 "cuts the wind", air gathers on the back of the wings like white clouds
'Vietnam - Proudly Stepping Forward to the Future' Spreads National Pride
Young people hunt for hair clips and gold star stickers for National Day holiday
See the world's most modern tank, suicide UAV at the parade training complex
The trend of making cakes printed with red flag and yellow star
T-shirts and national flags flood Hang Ma Street to welcome the important holiday
Discover a new check-in location: The 'patriotic' wall
Watch the Yak-130 multi-role aircraft formation 'turn on the power boost, fight round'
From A50 to A80 - when patriotism is the trend
'Steel Rose' A80: From steel footsteps to brilliant everyday life

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product