1. Time for survey and quotation submission: During office hours from April 5, 2024 to 4:00 p.m. on April 9, 2024. Place to receive quotation at the document department at 23 Ngo Quyen, Hoan Kiem, Hanoi .
2. Construction time: 20 days from the date of contract signing.
3. Quotation requirements: Must be prepared in accordance with the regulations on construction investment costs of the Ministry of Construction (with construction plan and basis for determining volume).
4. Requirements for supplies and materials: Supplies and materials must meet quality standards, have clear origin, and have complete records certifying product quality and origin.
5. Requirements for construction workers: Construction workers must have professional technical qualifications, be fully equipped with labor protection equipment, and ensure security and labor safety during construction.
6. Hygiene requirements: Because the underground water tank is located in front of the office building and operates normally during the waterproofing construction period, the construction unit is responsible for ensuring general hygiene. The construction area must be carefully covered with tarpaulin and have warning signs of the construction area... to avoid affecting the hygiene and administrative activities of the agency.
7. Warranty requirements: Completed work must be warranted for 12 months from the date of signing the acceptance report and handover for use.
8. Payment method requirements: By bank transfer. (Contact for survey: Mr. Nam, Phone number: 0913 281122)
For details, see here .
Source
Comment (0)