Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Along Tuyen Quang - Ha Giang, a large highway construction site is taking shape.

Báo Lao ĐộngBáo Lao Động28/02/2024

Along the entire Tuyen Quang - Ha Giang expressway, nearly 105 km long, a large construction site is taking shape with thousands of workers, engineers and a huge amount of machinery mobilized to the site.
Laodong.vn

Comment (0)

No data
No data

Same tag

Same category

Summary of A80 training: Vietnam's strength shines under the night of the thousand-year-old capital
Hanoi traffic chaos after heavy rain, drivers abandon cars on flooded roads
Impressive moments of the flight formation on duty at the A80 Ceremony
More than 30 military aircraft perform for the first time at Ba Dinh Square

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product