
According to the Hue City Hydrometeorological Station, from the morning of October 29 to the morning of October 31, the area continued to have heavy to very heavy rain with total rainfall ranging from 800-1,000mm, in some places exceeding 1,200mm.
The People's Committee of Hue City requires departments, branches, sectors and localities to mobilize all forces according to the "4 on-site" motto, organize environmental sanitation and disinfection immediately after the water recedes; absolutely do not let people suffer from hunger, cold, lack of clean water or lack of medical care; Chairmen of People's Committees of communes and wards take full responsibility if damage occurs due to subjectivity and lack of responsibility.

The telegram also requested the Department of Agriculture and Environment and the Department of Industry and Trade to coordinate in regulating irrigation and hydropower reservoirs safely, contributing to reducing downstream floods; the Department of Health to deploy epidemic prevention work, ensuring medicines and medical equipment; the Department of Education and Hue University to urgently repair school facilities, ensuring students return to school soon.
In addition, the Department of Construction, Department of Transport and armed forces were assigned to focus on repairing damaged works and opening key traffic routes; the City Civil Defense Command was assigned to regularly inspect, urge, and synthesize reports before November 6.
Source: https://nhandan.vn/hue-tiep-tuc-mua-to-chinh-quyen-va-nguoi-dan-chu-dong-khac-phuc-hau-qua-mua-lu-post918874.html






Comment (0)