Vietnam.vn - Nền tảng quảng bá Việt Nam

Approval of plan to combat power shortages during peak dry season months in 2024

Báo An ninh Thủ đôBáo An ninh Thủ đô03/01/2024


ANTD.VN - The Ministry of Industry and Trade approved the Power Supply Plan for the peak months of the dry season in 2024, from April to July, assigning specific tasks to each relevant unit.

Năm 2024, miền Bắc có thể tiếp tục thiếu điện vào mùa hè

In 2024, the North may continue to have power shortages in the summer.

According to this Plan, the total electricity produced by power plants (at the generator terminals) and imported nationwide during the peak dry season months of 2024 is 109,183 billion kWh.

The Ministry of Industry and Trade requires Vietnam Electricity Group (EVN) to be responsible for announcing the Power Supply Plan for the peak months of the dry season in 2024, including the plan to mobilize monthly electricity output for investors of power plants and related units so that the units can proactively prepare appropriate backup plans for electricity production.

Before March 15, 2024, EVN is responsible for updating and reporting to the Ministry of Industry and Trade on the Plan to ensure electricity for the national power system (including the plan to prepare fuel for thermal power plants), especially in the North during the peak months of the dry season in 2024 with scenarios to control and respond to difficulties in electricity supply, with reserves to ensure response to extreme situations, incidents, and difficulties;

Closely coordinate with hydropower reservoir management and operation units to regularly update and closely follow the hydrological situation of hydropower reservoirs to have an optimal and effective reservoir operation plan, comply with regulations and inter-reservoir and single-reservoir operation procedures, and ensure security and safety of power supply;

EVN is also responsible for directing and operating power generation units under its management in terms of maintenance and repair, and preparing good conditions to ensure safe and stable power production according to the operation and mobilization plan of the national power system;

Review the 500-220-110kV grid operation plan; check and review the generator shedding adjustment, special shedding systems throughout the power system, low-frequency load shedding relay system (F81) to respond to serious incidents on the 500kV North-South transmission grid when transmission is high...

Vietnam National Oil and Gas Group, Vietnam National Coal and Mineral Industries Group , Dong Bac Corporation and other coal suppliers are responsible for ensuring fuel and operating affiliated power plants to ensure power generation.

At the conference to review the work of 2023 and deploy tasks for 2024 of Vietnam Electricity Group (EVN) recently held, Mr. Nguyen Duc Thien, General Director of the Northern Power Corporation (EVNNPC) said that with the forecasted electricity load plan, the risk in 2024 is that the North may lack from 1,200 - 2,500 MW, especially in the summer period from May to July.

The power shortage occurred while the allocated capacity of the National Power System Control Center (A0) was very low and prolonged, leading to the corporation having to adjust and reduce a large amount of load. The estimated maximum capacity to be adjusted and laid off was 3,952 MW. The reduced electricity output was estimated at 608 million kWh.

Currently, EVNNPC has developed two power supply scenarios for 2024 based on load forecast and A0 availability announcement. Accordingly, with the test scenario and the high load forecast scenario, EVNNPC may lack from 1,200 - 2,500 MW from the end of May to July.

In August, A0 calculated that water supply was better, so the available source was higher and the load also tended to be low, so the possibility of a capacity shortage was less. In the last months of the year, the demand for electricity is expected to be high and there is a risk of a shortage of 200 - 400MW.



Source link

Comment (0)

No data
No data
Lost in the wild world at the bird garden in Ninh Binh
Pu Luong terraced fields in the pouring water season are breathtakingly beautiful
Asphalt carpets 'sprint' on North-South highway through Gia Lai
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'

Heritage

Figure

Business

No videos available

News

Political System

Local

Product