Vietnam.vn - Nền tảng quảng bá Việt Nam

Thanh Hoa: Commencement of construction of textile factory project with total investment of over 1,000 billion VND

Việt NamViệt Nam25/05/2024

Toàn cảnh lễ khởi công.

Overview of the groundbreaking ceremony.

Accordingly, the Nam Ich Thai Thang Textile Factory project is built on a total area of more than 8 hectares, with a total investment of 1,090 billion VND with the goal of producing high-quality wool and garment products to serve the Vietnamese market and for export.

The factory is invested in construction with a scale of 3 single-storey weaving workshops, 3 double-storey weaving workshops (total area of 3.3 hectares; garment workshop area with 2 single-storey sewing workshops, 2 double-storey sewing workshops (total area of more than 2.2 hectares); in addition, there are a number of other items such as shift rest houses, dormitories, office buildings, etc.

The factory will create stable employment opportunities for more than 5,000 workers, contribute to the locality through taxes and social welfare policies; contribute to promoting the overall socio -economic development of the locality and neighboring areas.

Đại diện Tập đoàn Nam Ích - Chủ đầu tư dự án phát biểu tại buổi lễ.

Representative of Nam Ich Group - Project investor spoke at the ceremony.

Speaking at the ceremony, a representative of Nam Ich Group said that the Group was established in 1963 in Hong Kong (China). In 1981, it began expanding its investment in China and many other countries, including Vietnam, with the determination to bring the Group's sweater manufacturing brand to the top position in the world .

In Thanh Hoa , Nam Ich Group officially put the first factory into operation in 2018 at Dinh Huong Industrial Park - Tay Bac Ga, Dong Linh Ward, Thanh Hoa City with a workforce of up to 1,400 people. The second factory went into operation in 2020 at Trung Chinh Quarter, Thuong Xuan Town, Thuong Xuan District with a workforce of 2,000 workers.

Nam Ich Thai Thang Textile Factory is built in Thai Thang Industrial Park, Hoang Hoa District. It is the third factory, constructed by Viet Hung Group Joint Stock Company, and is expected to be completed and put into operation by January 2025.

Nhà máy đi vào hoạt động sẽ tạo cơ hội việc làm ổn định cho hơn 5.000 lao động của địa phương.

The factory, once operational, will create stable jobs for more than 5,000 local workers.

Speaking at the ceremony, the leaders of Hoang Hoa district requested the investor and contractor to focus on construction to ensure the progress and quality of the factory. At the same time, they requested the functional agencies and local authorities to create favorable conditions within the legal framework for the investor and contractor to implement construction and put the project into operation soon.

According to People's Army Newspaper

Source

Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product