Vietnam.vn - Nền tảng quảng bá Việt Nam

See the magnificence of the 9 pedestrian bridges connecting Metro 1

Báo Dân ViệtBáo Dân Việt20/12/2024

9 pedestrian bridges connecting to Metro Line 1 stations Ben Thanh - Suoi Tien have been completed, creating convenience for people when taking the train.


See the magnificence of the 9 pedestrian bridges connecting Metro Line 1

Friday, December 20, 2024 10:33 AM (GMT+7)

9 pedestrian bridges connecting to Metro Line 1 stations Ben Thanh - Suoi Tien have been completed, creating convenience for people when taking the train.

img

On December 22, Metro Line 1 will officially be put into commercial operation. To ensure synchronous operation, the pedestrian bridges connecting the elevated stations of Metro Line 1 have been completed.

img

9 pedestrian bridges connect to Metro Line 1 station (Ben Thanh - Suoi Tien) including Thao Dien, Tan Cang, Rach Chiec, Phuoc Long, Binh Thai, High Technology, An Phu, Thu Duc stations and National University station.

img

According to Dan Viet reporters, the pedestrian bridges have been completed and are ready for Metro Line 1 to officially start operating on December 22.

img

The pedestrian bridge of Metro Line 1 station is built mainly on Vo Nguyen Giap street (old Hanoi Highway).

img

Pedestrian bridges help connect stations with residential areas, industrial zones, schools and bus stops.

img

The use of a pedestrian bridge connecting Metro Line 1 station facilitates people's movement.

img

The pedestrian bridge is designed similar to the station structure with a steel dome and heat-resistant roofing panels. Flowers and ornamental plants are planted on both sides of the bridge to create a comfortable feeling for passengers when moving.

img

The pedestrian bridge connecting the Metro station of Ho Chi Minh City National University has also been completed and serves people traveling when experiencing the trial run of Metro train No. 1.

img

The Ho Chi Minh City Urban Railway Management Board (MAUR) said that Metro Line 1 (Ben Thanh - Suoi Tien) entered its final trial run with 200 trips/day before commercial operation on December 22. The train began its trial run from December 13 to 21, from 5am to 10pm.

img

The train departs from Long Binh Depot (Long Binh Ward, Thu Duc City), ending at Ben Thanh Underground Station (District 1) with a distance of nearly 20km. Trains operate every 8-12 minutes, travel time is about 30 minutes and stop time at each station is 30 seconds.

Dieu Binh



Source: https://danviet.vn/xem-do-hoanh-trang-cua-9-cau-bo-hanh-ket-noi-metro-1-20241219162904825.htm

Comment (0)

No data
No data

Same category

Thanh Hoa coastal wooden bridge causes a stir thanks to its beautiful sunset view like in Phu Quoc
The beauty of female soldiers with square stars and southern guerrillas in the summer sun of the capital
Forest festival season in Cuc Phuong
Explore Hai Phong culinary tour

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product