Vietnam.vn - Nền tảng quảng bá Việt Nam

The main traffic point through Gianh bridge is overloaded.

(PLVN) - After a long holiday, a stream of vehicles from entertainment venues moved from the South to the North, making it difficult to move at the vital traffic point across Gianh Bridge (Quang Binh).

Báo Pháp Luật Việt NamBáo Pháp Luật Việt Nam03/05/2025

On the afternoon of May 3, records at the scene showed that traffic across Gianh Bridge on National Highway 1 (connecting Bo Trach district with Ba Don town, Quang Binh province) was congested for more than 500m in the South - North direction.

Dòng xe cá nhân từ hướng Phong Nha - Kẻ Bàng đổ dồn về ngã Ba Nam cầu Gianh để nhập làn với Quốc lộ 1 di chuyển ra Bắc.

Private vehicles from Phong Nha - Ke Bang direction poured into the Gianh Bridge South intersection to join Highway 1 moving north.

At around 3:50 p.m., the flow of vehicles from the South to the North and the Phong Nha - Ke Bang tourist routes, entertainment venues, and recreation areas pouring into the Gianh Bridge South intersection to join Highway 1 moving to the North was too large, causing traffic through this area to be overloaded.

Although the Quang Binh Traffic Police have mobilized officers to coordinate with local police to regulate traffic, at the Gianh bridge bottleneck, the flow of vehicles moves slowly, with some times causing local congestion.

Lực lượng chức năng căng mình điều tiết giao thông.

The authorities are straining to regulate traffic.

The old Gianh Bridge is now a vital traffic point, but the narrow bridge has only 2 lanes and has deteriorated after many years of use. During holidays, especially the April 30-May 1 holiday, the increased pressure causes National Highway 1 to often become congested here.

To solve the above situation, Gianh bridge is being upgraded and repaired. The project starts at Km624+799 (Ba Don town) and ends at Km626+901 (Ha My commune, Bo Trach district), with a length of nearly 750m.

After the festival, the traffic volume from the South to the North was so large that the Gianh Bridge intersection (Quang Binh) was sometimes overloaded.

After being upgraded and repaired, the bridge was upgraded to 2 lanes for motor vehicles and 2 lanes for non-motor vehicles, 12m wide. The approach roads at both ends of the bridge are 20.5m wide, meeting high traffic volume.

It is expected that when completed, Gianh Bridge will increase traffic capacity, connect traffic, and promote socio-economic development in the Northern Quang Binh region.

While waiting for Gianh Bridge to be upgraded and repaired, PC08 Department of Quang Binh Police recommends that people take the initiative to plan their routes to avoid prolonged congestion on National Highway 1 at the Gianh Bridge intersection from today until noon tomorrow, May 4.

Source: https://baophapluat.vn/diem-giao-thong-huyet-mach-qua-cau-gianh-qua-tai-post547319.html


Comment (0)

No data
No data

Same category

Discover Mu Cang Chai terraced fields in the flooding season
Fascinated by birds that lure mates with food
What do you need to prepare when traveling to Sapa in the summer?
The wild beauty and mysterious story of Vi Rong cape in Binh Dinh

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product