Vietnam.vn - Nền tảng quảng bá Việt Nam

Installing marker posts to reduce conflicts on Mai Dich steel overpass

Báo Giao thôngBáo Giao thông25/05/2024


After more than half a month of opening two steel overpasses for vehicles traveling in the inner city, the traffic situation at Mai Dich intersection has improved mainly on the roads under the overpass. The Xuan Thuy - Ho Tung Mau direction has reduced congestion due to the opening of new lanes under the bridge.

However, there are still conflicts between traffic from the overpass going down to the lower Ring Road 3 and vehicles from the lower road wanting to merge into the elevated lane.

Lắp cọc tiêu, giảm xung đột trên cầu vượt thép Mai Dịch- Ảnh 1.

To completely prevent traffic chaos, reduce conflicts and the risk of accidents, the construction and management unit of the bridge has installed additional rows of markers.

Faced with the above situation, and to reduce conflicts and the risk of accidents, the construction and management unit has installed additional rows of marker posts on both sides of the steel overpass extending to the elevated slope of Ring Road 3, about 100m long.

Reporters' records show that there are rows of cones to prevent cars and motorbikes from encroaching on the lane, helping the elevated Ring Road 3 expressway and the newly put into use steel overpass to operate as designed.

Urban traffic (Pham Hung - Pham Van Dong street) and Ring Road 3 elevated road are clearly separated.

"With the installation of this row of traffic cones, traffic on the elevated ramp of Ring Road 3 when going down to Mai Dich intersection is organized in the direction that cars are allowed to turn right, with cars and motorbikes traveling on the road below being prohibited from going up the concrete overpass (Ring Road 3 elevated road), which has helped vehicles travel more conveniently, reducing congestion much more than before," said Mr. Nguyen Xuan Quan (Cau Giay, Hanoi ).

The commander of Traffic Police Team No. 6, Traffic Police Department, Hanoi City Police said: "Up to now, traffic through the overpass has been stable, not as problematic as the first days of operation, only during rush hour the traffic density is higher but there is no congestion".

Traffic Police Team No. 6 maintains a checkpoint from morning to 10pm every day to regulate traffic flow and be ready to respond when congestion occurs.

In addition, Traffic Police Team No. 6 also assigned a patrol team on the route to handle violations, order, and traffic safety.

The project to build a steel overpass at Mai Dich intersection started in early 2023 with a total investment of about 340 billion VND. After about a year of construction, in the early morning of May 6, this project was officially opened to traffic.

Each side of the steel bridge is 7.7m wide, with a 3.5m wide motor vehicle lane and a 2.75m wide motorbike lane.

After opening to traffic, the old Mai Dich bridge was separated into an expressway axis, connecting to the elevated Ring Road 3. The new steel bridge on both sides ensures mixed traffic of motorbikes and cars that do not need to go up to the elevated Ring Road 3.



Source: https://www.baogiaothong.vn/lap-coc-tieu-giam-xung-dot-tren-cau-vuot-thep-mai-dich-192240525165217458.htm

Comment (0)

No data
No data
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan
Lotus tea - A fragrant gift from Hanoi people

Heritage

Figure

Business

No videos available

News

Political System

Local

Product