Vietnam.vn - Nền tảng quảng bá Việt Nam

Temporarily suspending the Director of Ha Long Electricity due to power outage for many days

Báo Kinh tế và Đô thịBáo Kinh tế và Đô thị10/09/2024


According to the decision, Director of Ha Long City Electricity Nguyen Dai Cuong was temporarily suspended from his position from 6:00 p.m. on September 9, 2024 until a replacement decision is made.

However, Mr. Nguyen Dai Cuong still needs to be present at Ha Long City Electricity to fix the power grid after storm No. 3 and the production and business activities of the electricity company.

Previously, storm No. 3 made landfall in Quang Ninh , causing serious damage to the power grid. A series of power poles were broken, blocking roads, causing traffic jams. Many households, production facilities and businesses were left without power for a long time.



Source: https://kinhtedothi.vn/tam-dinh-chi-giam-doc-dien-luc-ha-long-do-de-mat-dien-nhieu-ngay.html

Comment (0)

No data
No data
Lost in the wild world at the bird garden in Ninh Binh
Pu Luong terraced fields in the pouring water season are breathtakingly beautiful
Asphalt carpets 'sprint' on North-South highway through Gia Lai
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'

Heritage

Figure

Business

No videos available

News

Political System

Local

Product