A large crack appeared at the landslide point at Km28+500 Provincial Road 177. |
Immediately after the landslide, the Provincial Traffic Construction Investment Project Management Board directed the contractors to urgently mobilize human resources and machinery to clear the soil and rocks. However, the complicated heavy rain situation affected the repair work and large cracks formed in some locations. With a large volume of soil and rocks and difficult weather, the construction units made efforts to complete the landslide clearing and open the road to traffic before 12:00 on August 23.
The mass of landslides caused traffic congestion. |
Therefore, vehicle owners and people traveling on the above route need to pay attention to have a convenient schedule and ensure traffic safety. At the same time, continue to grasp the situation of the flood levels in the locality, proactively prevent to protect yourself and your family.
News and photos: Nguyen Yem
Source: https://baotuyenquang.com.vn/xa-hoi/202508/xuat-hien-vet-nut-lon-va-sat-lo-nghiem-trong-tai-km28500-tinh-lo-177-04b388c/
Comment (0)