To ensure that bus routes operate stably, smoothly, safely and well serve the travel needs of passengers, from today (June 2), the Hanoi City Traffic Management and Operation Center will adjust the routes of bus routes 74, 87, 88, 107, 157 according to traffic organization to serve the construction of the grade-separated intersection between Ring Road 3.5 and Thang Long Avenue.
Specifically, for bus routes 74, 88 and 157, the bus management unit will adjust the return route as follows: Buses will enter the expressway lane near the residential underpass No. 6, then exit the expressway lane near the Tay Mo overpass (Road 70). The direction of these routes will remain the same as the current route.

For bus route 87, the return route will be adjusted to the following direction: Nam An Khanh – Thien Phuc – road under Coc bridge overpass – road connecting to Thang Long Avenue (receiver lane) – Thang Long Avenue (receiver lane). This route replaces the old route: Nam An Khanh – Le Trong Tan (now the new Hoang Tung street) – Thang Long Avenue (receiver lane). The outbound route will remain the same as the current route.
Bus route 107 is also adjusted to the same return route as route 87, in the direction: Nam An Khanh - Thien Phuc - road under Coc bridge overpass - road connecting to Thang Long Avenue (receiver lane) - Thang Long Avenue (receiver lane), replacing the old route via Le Trong Tan (now the new Hoang Tung street). The direction remains unchanged.
Source: https://cand.com.vn/Giao-thong/ha-noi-dieu-chinh-lo-trinh-hang-loat-tuyen-buyt-phuc-vu-thi-cong-vanh-dai-3-5-i770325/
Comment (0)