Vietnam.vn - Nền tảng quảng bá Việt Nam

Many landslides on National Highway 27C connecting Da Lat

Báo Thanh niênBáo Thanh niên14/09/2023


On September 14, Thanh Nien reporters were present at landslide sites along National Highway 27C and recorded the landslide sites there.

Nhiều điểm sạt lở trên quốc lộ 27C nối Đà Lạt- Nha Trang - Ảnh 1.

Km 105+300 QL27C has serious landslide.

According to local people, after heavy rains in early September 2023, the landslide at Km 105+300 QL27C (village 1, Da Sar commune, Lac Duong district, Lam Dong ) became more serious, vehicles can only travel one way when passing this landslide. Currently, Lam Dong Department of Transport is urgently fixing and repairing.

Nhiều điểm sạt lở trên quốc lộ 27C nối Đà Lạt- Nha Trang - Ảnh 2.

Overcoming landslide at Km 105+300 QL27C

Here, the construction unit is driving cajuput piles to limit landslides. The construction unit representative said that overcoming the landslide is difficult due to underground water flowing from the mountainside.

Nhiều điểm sạt lở trên quốc lộ 27C nối Đà Lạt- Nha Trang - Ảnh 3.

More than 50% of National Highway 27C at Km 105+300 has dangerous landslides

At Km 80+800, in Tupoh village, Da Chais commune (Lac Duong), a new landslide was recorded. The landslide swept away 5 drainage culverts and created a deep hole; the land near the edge of National Highway 27 was eroded like a "frog's mouth".

Nhiều điểm sạt lở trên quốc lộ 27C nối Đà Lạt- Nha Trang - Ảnh 4.

Landslide point at Km 80+800, in Tupoh village, Da Chais commune (Lac Duong)

After a field survey, the Traffic Inspection Team (Lam Dong Department of Transport) said that they would report and propose immediate remediation of this landslide. It is known that this area has weak soil, previously suffered from serious landslides, and it took many years to stabilize.

Nhiều điểm sạt lở trên quốc lộ 27C nối Đà Lạt- Nha Trang - Ảnh 5.

Check landslide at Km 80 QL27C

Also on this route, at Km 108+50 (Da Sar commune), there is a landslide section on the negative slope about 30 m long that is being repaired by Lam Dong Department of Transport.

Nhiều điểm sạt lở trên quốc lộ 27C nối Đà Lạt- Nha Trang - Ảnh 6.

The landslide at Km 108+50 QL27C is being repaired by Lam Dong Department of Transport.

Speaking to reporters, Mr. Nguyen Van Gia, Director of Lam Dong Department of Transport, said that the cost of repairing the two landslides at Km 105+800 and Km 108+50 is nearly 5.5 billion VND. According to the plan, the landslide repair will be completed by the end of October 2023. As for the new landslide at Km 80+800, the department will have a repair plan as soon as possible to ensure traffic safety.

Quick view at 12:00 on September 14: Panorama news



Source link

Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product