(HNM) - Hanoi People's Committee has just issued Decision No. 2595/QD-UBND approving the red line of Dang Thai Mai Street, phase 1, scale 1/500 in Tay Ho district.
The route is about 1.3km long, starting at the intersection with Xuan Dieu Street and ending at Tay Ho Villa Area. The route is determined based on the existing Dang Thai Mai Street, in accordance with the Urban Zoning Plan of the West Lake area and vicinity (A6) and the regional routes approved by the City People's Committee...
In terms of nature, the section from Xuan Dieu Street to Lane 35 Dang Thai Mai Street is the landscape axis of the Quang An peninsula area. The cross-section scale of the road is divided into 2 sections: Section 1 from the starting point of the intersection with Xuan Dieu Street to Lane 35 Dang Thai Mai Street has a typical cross-section of 93.6m, including traffic roads on both sides, each side is 19-21m wide (roadway 15m, sidewalks 4-6m wide), the landscape axis in the middle is 51.6m wide; Section 2 follows Section 1 to the end of the route, with a typical cross-section of 20.5m, including a roadway of 11.25m, sidewalks on both sides, each side is 4.625m wide.
Source
Comment (0)