![]() |
My Yen intersection in Ben Luc district, Long An province is under urgent construction and is gradually taking shape. |
![]() |
Many bridge piers, branches and approach roads have been formed, some sections have begun to be paved. |
![]() |
Currently, workers and machines are mobilizing maximum force and urgently constructing at the construction site. |
![]() |
A branch of Ho Chi Minh City Ring Road 3 Bridge connects with the remaining two highways. |
![]() |
Many roads at the intersection have been paved with asphalt, signs installed and basic technical items completed. |
![]() |
At the construction site, workers are busy constructing fence items... |
![]() |
The starting point of the Ben Luc-Long Thanh expressway at My Yen intersection in Ben Luc district, Long An province is ready to serve traffic. |
![]() |
The starting point of Ben Luc-Long Thanh Expressway is at My Yen intersection in Ben Luc district, Long An province. |
![]() |
Heavy traffic on the Ho Chi Minh City-Trung Luong Expressway, the main artery connecting Ho Chi Minh City with the West. |
![]() |
At the same time, the bridge section leading to the Ho Chi Minh City-Trung Luong Expressway is entering the completion stage. |
![]() |
Workers and machines are busy at the construction site of Ho Chi Minh City's Ring Road 3, passing through Long An province. |
![]() |
My Yen Interchange, which will start construction in 2022, connects three major traffic axes including Ho Chi Minh City-Trung Luong Expressway (valued at VND10,000 billion), Ben Luc-Long Thanh Expressway (VND30,000 billion) and Ring Road 3 (VND75,000 billion). With a total value of more than VND110,000 billion, this intersection not only plays a key technical role, but also contributes to reducing traffic pressure on National Highway 1 and neighboring routes, shortening the time to transport goods between the West, East and Ho Chi Minh City. |
Source: https://nhandan.vn/anh-can-canh-cong-trinh-ket-noi-3-tuyen-cao-toc-huet-mach-mien-nam-post882890.html
Comment (0)