Vietnam.vn - Nền tảng quảng bá Việt Nam

Consulting agencies and units on the master plan of the HHO-5 social housing area (Hacom Galacity) at 120 Dien Bien Phu, Bac Nha Trang ward

The People's Committee of Bac Nha Trang Ward has just issued Document No. 2384/UBND-KTHTDT dated October 24, 2025 on planning to collect opinions from individuals, organizations, and residential communities on the Master Plan of the HHO-05 Social Housing Area (Hacom Galacity) at 120 Dien Bien Phu Street, Bac Nha Trang Ward, Khanh Hoa Province.

Báo Khánh HòaBáo Khánh Hòa30/10/2025

1. Form of collecting opinions: Post information about the Master Plan Document and the opinion collection form at the Headquarters of the People's Committee of Bac Nha Trang Ward; the Electronic Information Portal of Bac Nha Trang Ward and Khanh Hoa Newspaper.

2. Time for collecting comments: 20 days from the date of signing and promulgating Document No. 2384/UBND-KTHTDT dated October 24, 2025.

3. Content of consultation:
According to the Master Plan of Social Housing Area HHO-05 (Hacom Galacity), Comment Form and Summary Description.

4. Summary of Planning Information of the General Plan of the Social Housing Area HHO-05 (Hacom Galacity) at 120 Dien Bien Phu Street, Bac Nha Trang Ward:
a) Location: No. 120 Dien Bien Phu Street, Bac Nha Trang Ward, Khanh Hoa Province. Boundaries are as follows:
+ North side borders Ngo Lan Chi street.
+ South borders Dien Bien Phu street.
+ West side borders Hoang Tang Bi street.
+ East side borders Nguyen Huy Hieu street.
b) Scale of the master plan area:
- Total area of ​​planning research area: 5167.7m².
- Construction of high-rise social housing projects;
- Construction density of base block 53.4%, tower block 41.5%;
- Building height: Above ground: 23 floors; Underground: 1 floor (serving the technical system, fire protection and parking of the building).
- Total construction floor area: Above ground (excluding technical elevator shaft) is about 50,565 m²; Underground area is about 4,982 m² (serving the technical system, fire protection and parking of the project, of which the area used for parking is about 4,480 m²).
- Total number of social housing apartments: 520 apartments, housing construction floor area 46,781.5m²
- Population size is about 1,332 people.
- Construction level: Level 1.
- The main functions are arranged and divided according to preliminary floor height: Basement designed for parking; technical; 1st and 2nd floors are designed for lobby, commercial services, public (kindergarten, community activities) and apartments; tower floors (3rd to 23rd floors) are designed for apartment blocks.

Source: https://baokhanhhoa.vn/rao-vat-tuyen-dung/202510/lay-y-kien-cac-co-quan-don-vi-gop-y-doi-voi-quy-hoach-tong-mat-bang-khu-nha-o-xa-hoi-hho-5-hacom-galacity-tai-so-120-dien-bien-phu-phuong-bac-nha-trang-3b4208e/


Comment (0)

No data
No data

Same category

Each river - a journey
Ho Chi Minh City attracts investment from FDI enterprises in new opportunities
Historic floods in Hoi An, seen from a military plane of the Ministry of National Defense
The 'great flood' on Thu Bon River exceeded the historical flood in 1964 by 0.14 m.

Same author

Heritage

Figure

Enterprise

Watch Vietnam's coastal city make it into the world's top destinations in 2026

News

Political System

Destination

Product